logo
square E-STORE
$ USD down

2 комнатная квартира с европланировкой, 46.87м2

Artville, building 22, floor 10 ID: AB-22-10/00008
39 304$ ₴1 680 250

Without decoration

two-room european layout (2 bedrooms + kitchen-living room) Ванная
45 150$
₴1 930 170
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
AB-22-10/00008
Building
22
Floor
10
Number of rooms
2
Area
46.87 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 4 696$₴200 760 from 843$₴36 040/mos.
Interest-free with decoration Basic-full to 48 mos. from 18 241$₴779 810 from 561$₴23 990/mos.
Super light with decoration Basic-light to 60 mos. from 4 696$₴200 760 from 812$₴34 720/mos.
Interest-free with decoration Basic-light to 48 mos. from 18 241$₴779 810 from 252$₴10 780/mos.
Super light without decoration to 60 mos. from 4 696$₴200 760 from 591$₴25 270/mos.
Interest-free without decoration to 48 mos. from 18 241$₴779 810 from 303$₴12 960/mos.

About the flat

Квартира AB-22-10/00008 находится на 10 этаже в доме №22 жилого городка Artville.

Любуйтесь ежедневно на парк из своей 2-комнатной квартиры. Расположение на западной стороне дает ей дополнительное преимущество: вы можете каждый день наслаждаться Солнцем, заходящим за горизонт живописной украинской степи.

В кухне-студии, площадью 22.76 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

Площадь санузла — 3.53 м2. Благодаря правильному расположению точек подключения, здесь помещается душевая кабина, стиральная машина и вся другая необходимая сантехника.

Specification

Flat ID
AB-22-10/00008
Building
22
Floor
10
Area
46.87 m2
Number of rooms
2
Bathroom area
3.53 m2
Kitchen area
22.76 m2
Room area
11.65 m2
Room 2 area
8.93 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 22/ 10 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-22-10/00008
Building
22
Floor
10
Area
46.87 m2
Number of rooms
2

Calculator

Minimum payment $

Construction progress

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

ARTVILLE - window installation, building #5
ARTVILLE - window installation, building #5
10.10.2024
There is progress in building #5! We are completing the installation of windows on the 8th floor. So now we are looking forward to a new batch of...

There is progress in building #5!

We are completing the installation of windows on the 8th floor.

So now we are looking forward to a new batch of windows for the 7th floor, to continue the work, bringing the project closer to a new stage!

Stages of construction

Commissioning date II qtr. 2026
Building 22
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - window installation, building #5

10.10.2024

Similar flats in Artville

Price 39 304$ ₴1 680 250
Commissioning date II qtr. 2026
Area 46.87 m2
Price 39 304$ ₴1 680 250
Commissioning date II qtr. 2026
Area 46.87 m2
Price 42 376$ ₴1 811 580
Commissioning date II qtr. 2026
Area 51.14 m2
Price 42 376$ ₴1 811 580
Commissioning date II qtr. 2026
Area 51.14 m2

Similar flats in other projects

Price 35 675$ ₴1 525 110
Commissioning date I qtr. 2026
Area 57.99 m2
Price 36 884$ ₴1 576 800
Commissioning date II qtr. 2025
Area 41.37 m2
Price 39 000$ ₴1 667 250
Commissioning date I qtr. 2026
Area 47.26 m2
Price 40 300$ ₴1 722 830
Commissioning date II qtr. 2025
Area 41.37 m2