logo
$ USD down
  • Planning 2-rm flats area 41.29m2, 53051b40-364b-11eb-ba9c-00155d42e31d.
  • Planning 2-rm flats area 41.29m2, 53051b40-364b-11eb-ba9c-00155d42e31d.

2 bedroom apartment with European layout, 41.29m2

Urban Market, building 1, floor 8 ID: UM-001-08/0004
35 675$ ₴1 600 030

Assigment

two-room european layout (2 bedrooms + kitchen-living room) Ванная Терраса
35 675$
₴1 600 030
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-001-08/0004
Building
1
Floor
8
Number of rooms
2
Area
57.99 m2
Area (paid)
41.29 m2

About the flat

Хотите жить в уютном городке со всей необходимой инфраструктурой? Тогда переезжайте в квартиру UM-001-08/0004 в жилом городке Urban Market. Она расположена на этаже этаже в доме №1.

У вас будет кухня-студия, площадью 14.97 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

В санузле, площадью 3.31 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Терраса 23.85 м2 может превратиться в комфортную лаунж-зоны с креслами-мешками и уличной мебелью. Вы каждый день будете наблюдать за тихими и живописными рассветами, потому что она выходит на восток сторону.

Specification

Flat ID
UM-001-08/0004
Building
1
Floor
8
Area
57.99 m2
Area (paid)
41.29 m2
Number of rooms
2
Bathroom area
3.31 m2
Kitchen area
14.97 m2
Room area
7.99 m2
Room 2 area
7.87 m2
Terrace area
23.85 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 1/ 8 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-001-08/0004
Building
1
Floor
8
Area
57.99 m2
Number of rooms
2

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2028
Building 1
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 34 648$ ₴1 553 970
Commissioning date I qtr. 2028
Area 36.65 m2
Price 36 641$ ₴1 643 350
Commissioning date I qtr. 2028
Area 43.62 m2
Price 37 002$ ₴1 659 540
Commissioning date IV qtr. 2028
Area 44.05 m2
Price 37 909$ ₴1 700 220
Commissioning date IV qtr. 2028
Area 45.13 m2

Similar flats in other projects

Price 35 077$ ₴1 573 210
Commissioning date III qtr. 2028
Area 44.97 m2
Price 35 077$ ₴1 573 210
Commissioning date III qtr. 2028
Area 44.97 m2
Price 35 077$ ₴1 573 210
Commissioning date III qtr. 2028
Area 44.97 m2
Price 37 346$ ₴1 674 970
Commissioning date III qtr. 2028
Area 47.88 m2