3D
  • Planning 1-rm flats area 30.26m2, UM-006-04/0020.
  • Planning 1-rm flats area 30.26m2, UM-006-04/0020.

Одно комнатная квартира с европланировкой, 34.19м2

Urban Market, building 6, floor 4 ID: UM-006-04/0020
41 184$ ₴1 626 770

Without decoration

one-room european layout (bedroom + kitchen-living room) Ванная Балкон
45 875$
₴1 812 070
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-006-04/0020
Building
6
Floor
4
Number of rooms
1
Area
34.19 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 4 771$₴188 460 from 857$₴33 860/mos.
Interest-free with decoration Basic-full to 48 mos. from 18 534$₴732 100 from 570$₴22 520/mos.
Super light with decoration Basic-light to 60 mos. from 4 771$₴188 460 from 836$₴33 030/mos.
Interest-free with decoration Basic-light to 48 mos. from 18 534$₴732 100 from 438$₴17 310/mos.
Super light without decoration to 60 mos. from 4 771$₴188 460 from 761$₴30 060/mos.
Interest-free without decoration to 48 mos. from 18 534$₴732 100 from 472$₴18 650/mos.

About the flat

Квартира UM-006-04/0020 находится на 4 этаже в доме №6 жилого городка Urban Market.

У вас будет кухня-студия, площадью 10.57 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

В санузле, площадью 3.54 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 3.10 м2.

Балкон 5.61 м2 может превратиться в комфортную лаунж-зону с креслами-мешками. Вы каждый день будете наслаждаться яркими рассветами, потому что он выходит на восток сторону.

Specification

Flat ID
UM-006-04/0020
Building
6
Floor
4
Area
34.19 m2
Number of rooms
1
Balcony area
5.61 m2
Bathroom area
3.54 m2
Corridor area
3.10 m2
Kitchen area
10.57 m2
Room area
11.37 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 6/ 4 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-006-04/0020
Building
6
Floor
4
Area
34.19 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Construction progress in February 2023
Construction progress in February 2023
23.02.2023
Don't stop and keep building day after day! News from the ARTVILLE construction site: House 15: We continue the repair and facade work, as...

Don't stop and keep building day after day!


News from the ARTVILLE construction site:

House 15: We continue the repair and facade work, as well as the arrangement of the territory.

House 4: We received the materials and continue the glazing.

House 6: We continue to install interior partitions

Doma 21/22: Piling continues


UM-2: The 6th floor horizontal slab and the 7th floor vertical slab were poured with concrete.

UM-3: The interior walls and interior partitions of the 3rd floor were erected.


Just like a year ago, we are working to ensure that everyone who trusts us receives the keys to their own apartment and builds their life here with us. In the town of happy people.❤️

Results 2022
Results 2022
26.12.2022
It's time to sum up our work for the year and make plans for the future. Although this year has been very difficult, it has brought us new skills...
It's time to sum up our work for the year and make plans for the future.
Although this year has been very difficult, it has brought us new skills and an understanding that strength lies in unity and support.

3 turn
House #14:
In February and the beginning of March, we completed repairs in the first apartments and started commissioning already in mid-March.
During the year, 90% of the apartments in the house were handed over.

House #15:
Completed communications, rough repairs.
We are finishing the finishing of corridors, stairs and 2 floors have already been completed.
We continue repairs on the next floors.

4 turn
House #4:
We have completed the installation of windows by 60% and continue to work with the roof.
We plan to start working with ventilation.
House #5:
In 2022, the laying of external and internal walls was completed.

House #6:
We completed the monolithic structures of the house and the laying of the outer walls. Now we are laying the interior. Work is already underway on the 3rd floor!

5 turn
House #19:
Since the beginning of the year, we have completed the construction of the pile field, work with the foundation and built two floors of monolithic structures.

House #20:
We completed the construction of the pile field, work with the foundation and built three floors of monolithic structures.

Houses #21-22:
Leader drilling of piles has begun.


Houses above Urban Market
UM-1:
We completed the crushing and testing of piles.

UM-2:
Built 4.5 and 6 floors of monolithic structures.
The laying of the outer and inner walls of the 4th floor was also completed.

UM-3:
We built 5 floors of monolithic structures from 3 to 8.
The laying of the outer walls of the 3rd floor has been completed.

UM-4:
We completed the crushing and testing of piles.

Ход строительства в октябре 2022
Ход строительства в октябре 2022
20.10.2022
Октябрьские новости по строительству уже готовы! Делимся информацией о том,...
Октябрьские новости по строительству уже готовы!

Делимся информацией о том, как строился наш городок за последний месяц:

3 очередь
Дом №14:
Готовим к сдаче 1 этаж.

Дом №15:
11 этаж: устанавливаем кондиционеры. Готовим к сдаче.
10-9 этажа: монтируем плинтуса и натяжные потолки. Завершаем ремонты.
8-7 этажа: укладываем ламинат, монтируем потолок в коридорах.
6-3 этажа: укладываем плитку.
2-1 этажа: разводим сантехнику.

4 очередь
Дом №4:
Завершили монтаж окон на 3-4 этажах и 8-12 этажах.
Готовимся к установке оконных конструкций с 5 по 7 этажа.
Начали обустройство кровли.
Готовимся к устройству вентиляции.

Дом №5:
Выполняем кладку внутренних стен на 11 этаже.
Проводим подготовку к устройству кровли.
Проводим замеры для оконных конструкций.

Дом №6:
Завершили кладку стен на 12 этаже.

5 очередь
Дом №19:
Завершили опалубку перекрытия 1 этажа.
Продолжаем армирование.

Дом №20:
Продолжаем опалубку перекрытия 2 этажа.

Дома №21-22:
Готовимся к работе с полем свай.


Дома над Urban Market
UM-1:
Завершаем испытание свай.

UM-2:
Готовимся к перекрытию шестого этажа.

UM-3:
Выполнили бетонирование вертикальных конструкций 8 этажа.
Готовимся к горизонтальному перекрытию.
Завершили кладку наружных стен на третьем этаже.

UM-4:
Продолжаем давить сваи.

Construction progress in May 2023
Construction progress in May 2023
06.09.2022
A new piece of news from the construction site of the residential town ARTVILLE. We share the results of the last month and rush to build further....
A new piece of news from the construction site of the residential town ARTVILLE.
We share the results of the last month and rush to build further. Follow the news!

Stages of construction

Commissioning date III qtr. 2026
Building 6
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Construction progress in May 2023

06.09.2022

Similar flats in Urban Market

Price 37 531$ ₴1 482 480
Commissioning date IV qtr. 2024
Area 33.88 m2
Price 40 000$ ₴1 580 000
Commissioning date IV qtr. 2025
Area 43.92 m2
Price 40 000$ ₴1 580 000
Commissioning date IV qtr. 2024
Area 26.62 m2
Price 43 908$ ₴1 734 370
Commissioning date IV qtr. 2025
Area 32.5 m2

Similar flats in other projects

Price 38 000$ ₴1 501 000
Commissioning date I qtr. 2026
Area 34.84 m2
Price 38 153$ ₴1 507 050
Commissioning date I qtr. 2026
Area 32.79 m2
Price 39 400$ ₴1 556 300
Commissioning date I qtr. 2026
Area 30.48 m2
Price 42 000$ ₴1 659 000
Commissioning date I qtr. 2026
Area 36.66 m2