logo
square E-STORE
$ USD down
3D
  • Planning Smart flats area 25.54m2, UM-006-01/0023.
  • Planning Smart flats area 25.54m2, UM-006-01/0023.

Смарт квартира, 29.8м2

Urban Market, building 6, floor 1 ID: UM-006-01/0023
26 200$ ₴1 089 920

Assigment

smart apartment Ванная Балкон
26 200$
₴1 089 920
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-006-01/0023
Building
6
Floor
1
Area
29.80 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 2 725$₴113 360 from 745$₴31 000/mos.
Interest-free with decoration Basic-full to 48 mos. from 10 585$₴440 340 from 587$₴24 420/mos.
Super light with decoration Basic-light to 60 mos. from 2 725$₴113 360 from 727$₴30 250/mos.
Interest-free with decoration Basic-light to 48 mos. from 10 585$₴440 340 from 475$₴19 760/mos.
Super light without decoration to 60 mos. from 2 725$₴113 360 from 664$₴27 630/mos.
Interest-free without decoration to 48 mos. from 10 585$₴440 340 from 504$₴20 970/mos.

About the flat

Квартира UM-006-01/0023 находится на 1 этаже в доме №6 жилого городка Urban Market.

Со SMART-студии открывается вид на двор. Расположение комнат на восточной стороне позволяет каждый день наслаждаться яркими рассветами.

SMART-студия, площадью29.80 м2 — это удобная квартира, которая требует минимум ухода и расходов. Она отлично подходит для начала самостоятельной жизни.

В кухне-студии, площадью 17.11 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

Площадь санузла — 3.28 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 3.32 м2.

Балкон 6.09 м2 может превратиться в комфортную лаунж-зону с креслами-мешками. Вы каждый день будете наслаждаться яркими рассветами, потому что он выходит на восток сторону.

Specification

Flat ID
UM-006-01/0023
Building
6
Floor
1
Area
29.80 m2
Balcony area
6.09 m2
Bathroom area
3.28 m2
Corridor area
3.32 m2
Kitchen area
17.11 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 6/ 1 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-006-01/0023
Building
6
Floor
1
Area
29.80 m2

Calculator

Minimum payment $

Construction progress

Construction progress in February 2023
Construction progress in February 2023
23.02.2023
Don't stop and keep building day after day! News from the ARTVILLE construction site: House 15: We continue the repair and facade work, as...

Don't stop and keep building day after day!


News from the ARTVILLE construction site:

House 15: We continue the repair and facade work, as well as the arrangement of the territory.

House 4: We received the materials and continue the glazing.

House 6: We continue to install interior partitions

Doma 21/22: Piling continues


UM-2: The 6th floor horizontal slab and the 7th floor vertical slab were poured with concrete.

UM-3: The interior walls and interior partitions of the 3rd floor were erected.


Just like a year ago, we are working to ensure that everyone who trusts us receives the keys to their own apartment and builds their life here with us. In the town of happy people.❤️

Results 2022
Results 2022
26.12.2022
It's time to sum up our work for the year and make plans for the future. Although this year has been very difficult, it has brought us new skills...
It's time to sum up our work for the year and make plans for the future.
Although this year has been very difficult, it has brought us new skills and an understanding that strength lies in unity and support.

3 turn
House #14:
In February and the beginning of March, we completed repairs in the first apartments and started commissioning already in mid-March.
During the year, 90% of the apartments in the house were handed over.

House #15:
Completed communications, rough repairs.
We are finishing the finishing of corridors, stairs and 2 floors have already been completed.
We continue repairs on the next floors.

4 turn
House #4:
We have completed the installation of windows by 60% and continue to work with the roof.
We plan to start working with ventilation.
House #5:
In 2022, the laying of external and internal walls was completed.

House #6:
We completed the monolithic structures of the house and the laying of the outer walls. Now we are laying the interior. Work is already underway on the 3rd floor!

5 turn
House #19:
Since the beginning of the year, we have completed the construction of the pile field, work with the foundation and built two floors of monolithic structures.

House #20:
We completed the construction of the pile field, work with the foundation and built three floors of monolithic structures.

Houses #21-22:
Leader drilling of piles has begun.


Houses above Urban Market
UM-1:
We completed the crushing and testing of piles.

UM-2:
Built 4.5 and 6 floors of monolithic structures.
The laying of the outer and inner walls of the 4th floor was also completed.

UM-3:
We built 5 floors of monolithic structures from 3 to 8.
The laying of the outer walls of the 3rd floor has been completed.

UM-4:
We completed the crushing and testing of piles.

Ход строительства в октябре 2022
Ход строительства в октябре 2022
20.10.2022
Октябрьские новости по строительству уже готовы! Делимся информацией о том,...
Октябрьские новости по строительству уже готовы!

Делимся информацией о том, как строился наш городок за последний месяц:

3 очередь
Дом №14:
Готовим к сдаче 1 этаж.

Дом №15:
11 этаж: устанавливаем кондиционеры. Готовим к сдаче.
10-9 этажа: монтируем плинтуса и натяжные потолки. Завершаем ремонты.
8-7 этажа: укладываем ламинат, монтируем потолок в коридорах.
6-3 этажа: укладываем плитку.
2-1 этажа: разводим сантехнику.

4 очередь
Дом №4:
Завершили монтаж окон на 3-4 этажах и 8-12 этажах.
Готовимся к установке оконных конструкций с 5 по 7 этажа.
Начали обустройство кровли.
Готовимся к устройству вентиляции.

Дом №5:
Выполняем кладку внутренних стен на 11 этаже.
Проводим подготовку к устройству кровли.
Проводим замеры для оконных конструкций.

Дом №6:
Завершили кладку стен на 12 этаже.

5 очередь
Дом №19:
Завершили опалубку перекрытия 1 этажа.
Продолжаем армирование.

Дом №20:
Продолжаем опалубку перекрытия 2 этажа.

Дома №21-22:
Готовимся к работе с полем свай.


Дома над Urban Market
UM-1:
Завершаем испытание свай.

UM-2:
Готовимся к перекрытию шестого этажа.

UM-3:
Выполнили бетонирование вертикальных конструкций 8 этажа.
Готовимся к горизонтальному перекрытию.
Завершили кладку наружных стен на третьем этаже.

UM-4:
Продолжаем давить сваи.

Construction progress in May 2023
Construction progress in May 2023
06.09.2022
A new piece of news from the construction site of the residential town ARTVILLE. We share the results of the last month and rush to build further....
A new piece of news from the construction site of the residential town ARTVILLE.
We share the results of the last month and rush to build further. Follow the news!

Stages of construction

Commissioning date III qtr. 2026
Building 6
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Construction progress in May 2023

06.09.2022

Similar flats in Urban Market

Price 31 555$ ₴1 312 690
Commissioning date I qtr. 2026
Area 25.85 m2
Price 32 390$ ₴1 347 440
Commissioning date III qtr. 2026
Area 30.04 m2
Price 33 773$ ₴1 404 960
Commissioning date I qtr. 2026
Area 27.2 m2
Price 36 162$ ₴1 504 340
Commissioning date III qtr. 2026
Area 30.05 m2

Similar flats in other projects

Price 31 600$ ₴1 314 560
Commissioning date II qtr. 2021
Area 29.01 m2
Price 33 000$ ₴1 372 800
Commissioning date IV qtr. 2026
Area 25.11 m2
Price 34 000$ ₴1 414 400
Commissioning date IV qtr. 2020
Area 29.52 m2
Price 36 000$ ₴1 497 600
Commissioning date IV qtr. 2021
Area 31.99 m2