logo
$ USD down
  • Planning Smart flats area 23.8m2, 29a3ed03-7cc5-11eb-ba9e-00155d42e31d.
  • Planning Smart flats area 23.8m2, 29a3ed03-7cc5-11eb-ba9e-00155d42e31d.

Smart-apartment, 23.8m2

Urban Market, building 4, floor 6 ID: UM-004-06/0003
21 182$ ₴950 020

Without decoration

smart apartment Ванная Балкон
29 988$
₴1 344 970
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-004-06/0003
Building
4
Floor
6
Area
27.20 m2
Area (paid)
23.80 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Repair Ready to Use to 48 mos. from 9 116$₴408 860 from 435$₴19 510/mos.
Interest-free with decoration Repair Ready Box to 48 mos. from 9 116$₴408 860 from 420$₴18 840/mos.
Interest-free without decoration to 48 mos. from 9 116$₴408 860 from 252$₴11 310/mos.

About the flat

UM-004-06/0003 — это квартира в жилом городке Urban Market, расположенная на 6 этаже в доме №4.

Любуйтесь ежедневно на двор со своей SMART-студии. Расположение на западной стороне дает ей дополнительное преимущество: вы можете каждый день наблюдать за Солнцем, заходящим за горизонт живописной украинской степи.

SMART-студия, площадью27.20 м2 — это удобная квартира, которая требует минимум ухода и расходов. Она отлично подходит для начала самостоятельной жизни.

В кухне-студии, площадью 19.42 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

В санузле, площадью 2.93 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Балкон, площадью 4.85 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день наблюдать за Солнцем, заходящим за горизонт живописной украинской степи.

Specification

Flat ID
UM-004-06/0003
Building
4
Floor
6
Area
27.20 m2
Area (paid)
23.80 m2
Balcony area
4.85 m2
Bathroom area
2.93 m2
Kitchen area
19.42 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 4/ 6 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-004-06/0003
Building
4
Floor
6
Area
27.20 m2

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2028
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 19 429$ ₴871 400
Commissioning date I qtr. 2028
Area 21.83 m2
Price 20 248$ ₴908 130
Commissioning date I qtr. 2028
Area 22.75 m2
Price 20 595$ ₴923 690
Commissioning date I qtr. 2028
Area 23.14 m2
Price 22 000$ ₴986 700
Commissioning date I qtr. 2028
Area 25.12 m2

Similar flats in other projects

Price 19 746$ ₴885 610
Commissioning date III qtr. 2028
Area 23.79 m2
Price 21 000$ ₴941 850
Commissioning date III qtr. 2028
Area 23.96 m2
Price 21 500$ ₴964 280
Commissioning date IV qtr. 2027
Area 22.62 m2
Price 22 000$ ₴986 700
Commissioning date III qtr. 2028
Area 22.28 m2