logo
$ USD down
  • Planning 2-rm flats area 36.65m2, 29a3ed04-7cc5-11eb-ba9e-00155d42e31d.
  • Planning 2-rm flats area 36.65m2, 29a3ed04-7cc5-11eb-ba9e-00155d42e31d.

Двух-комнатная квартира с европланировкой, 36.65м2

Urban Market, building 4, floor 6 ID: UM-004-06/0004
39 800$ ₴1 785 030

Assigment

two-room european layout (2 bedrooms + kitchen-living room) Ванная Балкон
39 800$
₴1 785 030
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-004-06/0004
Building
4
Floor
6
Number of rooms
2
Area
43.80 m2
Area (paid)
36.65 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Repair Ready to Use to 48 mos. from 12 099$₴542 650 from 672$₴30 140/mos.
Interest-free with decoration Repair Ready Box to 48 mos. from 12 099$₴542 650 from 649$₴29 110/mos.
Interest-free without decoration to 48 mos. from 12 099$₴542 650 from 390$₴17 500/mos.

About the flat

Квартира UM-004-06/0004 находится на 6 этаже в доме №4 жилого городка Urban Market.

У вас будет кухня-студия, площадью 16.60 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

Площадь санузла — 4.22 м2. Здесь помещается душевая кабина, вся необходимая сантехника и стиральная машина.

Балкон, площадью 3.27 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день наслаждаться невероятными закатами Солнца.

Specification

Flat ID
UM-004-06/0004
Building
4
Floor
6
Area
43.80 m2
Area (paid)
36.65 m2
Number of rooms
2
Balcony area
6.94 m2
Bathroom area
4.22 m2
Kitchen area
16.60 m2
Room area
6.51 m2
Room 2 area
6.26 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 4/ 6 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-004-06/0004
Building
4
Floor
6
Area
43.80 m2
Number of rooms
2

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2028
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 28 955$ ₴1 298 640
Commissioning date I qtr. 2028
Area 34.47 m2
Price 32 038$ ₴1 436 910
Commissioning date IV qtr. 2028
Area 38.14 m2
Price 33 188$ ₴1 488 490
Commissioning date IV qtr. 2028
Area 39.51 m2
Price 33 188$ ₴1 488 490
Commissioning date IV qtr. 2028
Area 39.51 m2

Similar flats in other projects

Price 28 010$ ₴1 256 250
Commissioning date III qtr. 2028
Area 35.91 m2
Price 29 600$ ₴1 327 560
Commissioning date III qtr. 2028
Area 35.91 m2
Price 31 481$ ₴1 411 930
Commissioning date III qtr. 2028
Area 40.36 m2
Price 33 166$ ₴1 487 500
Commissioning date III qtr. 2028
Area 42.52 m2