logo
square E-STORE
$ USD down
3D
  • Planning 2-rm flats area 45.6m2, UM-004-03/0005.
  • Planning 2-rm flats area 45.6m2, UM-004-03/0005.

Two-bedroom apartment with European layout

Urban Market, building 4, floor 3 ID: UM-004-03/0005
48 475$ ₴2 028 680

Without decoration

two-room european layout (2 bedrooms + kitchen-living room) Ванная
56 055$
₴2 345 910
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-004-03/0005
Building
4
Floor
3
Number of rooms
2
Area
45.60 m2
Area (paid)
37.90 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 5 830$₴243 990 from 1 047$₴43 820/mos.
Interest-free with decoration Basic-full to 48 mos. from 22 646$₴947 740 from 697$₴29 170/mos.
Super light with decoration Basic-light to 60 mos. from 5 830$₴243 990 from 1 021$₴42 730/mos.
Interest-free with decoration Basic-light to 48 mos. from 22 646$₴947 740 from 389$₴16 280/mos.
Super light without decoration to 60 mos. from 5 830$₴243 990 from 788$₴32 980/mos.
Interest-free without decoration to 48 mos. from 22 646$₴947 740 from 432$₴18 080/mos.

About the flat

Квартира UM-004-03/0005 находится на 3 этаже в доме №4 жилого городка Urban Market.

Любуйтесь ежедневно на двор из своей 2-комнатной квартиры. Расположение на северной стороне дает ей дополнительное преимущество: вы можете каждый день наслаждаться легкой прохладой даже в жаркий день.

В кухне-студии, площадью 19.04 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

Площадь санузла — 3.71 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 4.23 м2.

Specification

Flat ID
UM-004-03/0005
Building
4
Floor
3
Area
45.60 m2
Area (paid)
37.90 m2
Number of rooms
2
Bathroom area
3.71 m2
Corridor area
4.23 m2
Kitchen area
19.04 m2
Room area
8.96 m2
Room 2 area
9.66 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 4/ 3 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-004-03/0005
Building
4
Floor
3
Area
45.60 m2
Number of rooms
2

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2026
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 46 650$ ₴1 952 310
Commissioning date II qtr. 2025
Area 44.21 m2
Price 47 000$ ₴1 966 950
Commissioning date I qtr. 2026
Area 34.47 m2
Price 47 300$ ₴1 979 510
Commissioning date II qtr. 2025
Area 42.93 m2
Price 47 900$ ₴2 004 620
Commissioning date II qtr. 2025
Area 44.47 m2

Similar flats in other projects

Price 43 853$ ₴1 835 250
Commissioning date I qtr. 2026
Area 56.22 m2
Price 45 000$ ₴1 883 250
Commissioning date II qtr. 2026
Area 49.16 m2
Price 50 000$ ₴2 092 500
Commissioning date II qtr. 2026
Area 47.88 m2
Price 51 000$ ₴2 134 350
Commissioning date II qtr. 2026
Area 47.88 m2