logo
$ USD down
  • Planning 1-rm flats area 57.67m2, 21c65f2b-1f56-11eb-ba9c-00155d42e31d.
  • Planning 1-rm flats area 57.67m2, 21c65f2b-1f56-11eb-ba9c-00155d42e31d.

1-bedroom apartment with European layout, 57.67m2

Urban Market, building 3, floor 8 ID: UM-003-08/0089
49 596$ ₴2 226 870

Without decoration

one-room european layout (bedroom + kitchen-living room) Ванная Park
70 934$
₴3 184 940
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-003-08/0089
Building
3
Floor
8
Number of rooms
1
Area
64.34 m2
Area (paid)
57.67 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Repair Ready to Use to 36 mos. from 21 564$₴968 230 from 1 372$₴61 610/mos.
Interest-free with decoration Repair Ready Box to 36 mos. from 21 564$₴968 230 from 1 324$₴59 450/mos.
Interest-free without decoration to 36 mos. from 21 564$₴968 230 from 779$₴34 980/mos.

About the flat

Specification

Flat ID
UM-003-08/0089
Building
3
Floor
8
Area
64.34 m2
Area (paid)
57.67 m2
Number of rooms
1
Bathroom area
9.74 m2
Corridor area
21.63 m2
Kitchen area
9.16 m2
Loggia area
13.34 m2
Room area
10.47 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 3/ 8 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-003-08/0089
Building
3
Floor
8
Area
64.34 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date II qtr. 2027
Building 3
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 45 600$ ₴2 047 440
Commissioning date II qtr. 2027
Area 40.62 m2
Price 48 762$ ₴2 189 420
Commissioning date II qtr. 2027
Area 36.45 m2
Price 50 482$ ₴2 266 650
Commissioning date II qtr. 2027
Area 58.7 m2
Price 50 929$ ₴2 286 720
Commissioning date II qtr. 2027
Area 59.22 m2

Similar flats in other projects

Price 45 600$ ₴2 047 440
Commissioning date IV qtr. 2021
Area 41.9 m2
Price 50 600$ ₴2 271 940
Commissioning date IV qtr. 2027
Area 39.72 m2
Price 52 800$ ₴2 370 720
Commissioning date II qtr. 2029
Area 27.36 m2
Price 53 915$ ₴2 420 790
Commissioning date IV qtr. 2027
Area 39.99 m2