3D
  • Planning 3-rm flats area 55.26m2, UM-003-04/0030.
  • Planning 3-rm flats area 55.26m2, UM-003-04/0030.

3-комнатная квартира с европланировкой, 61.06м2

Urban Market, building 3, floor 4 ID: UM-003-04/0030
49 712$ ₴1 948 720

Assigment

three-room european layout (3 bedrooms + kitchen-living room) Ванная Терраса
49 712$
₴1 948 720
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-003-04/0030
Building
3
Floor
4
Number of rooms
3
Area
61.06 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 5 170$₴202 670 from 1 589$₴62 290/mos.
Interest-free with decoration Basic-full to 48 mos. from 20 084$₴787 300 from 1 292$₴50 650/mos.
Super light with decoration Basic-light to 60 mos. from 5 170$₴202 670 from 1 551$₴60 800/mos.
Interest-free with decoration Basic-light to 48 mos. from 20 084$₴787 300 from 1 050$₴41 160/mos.
Super light without decoration to 60 mos. from 5 170$₴202 670 from 1 413$₴55 390/mos.
Interest-free without decoration to 48 mos. from 20 084$₴787 300 from 1 113$₴43 630/mos.

About the flat

Квартира UM-003-04/0030 находится на 4 этаже в доме №3 жилого городка Urban Market.

У вас будет кухня-студия, площадью 21.17 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

В квартире 2 санузла. В первом, площадью 2.63 м2, предусмотрено место под ванную. Второй санузел, площадью 3.46 м2 — гостевой, с душевой кабиной и другой сантехникой. Здесь же можно разместить стиральную машинку.

Террасу, площадью 8.29 м2, можно использовать в качестве лаунж-зоны. Она выходит на север сторону. Поэтому отсюда вы можете каждый день наслаждаться легкой прохладой даже в жаркий день.

Specification

Flat ID
UM-003-04/0030
Building
3
Floor
4
Area
61.06 m2
Number of rooms
3
Bathroom area
3.46 m2
Kitchen area
21.17 m2
Room area
8.48 m2
Room 2 area
8.72 m2
Room 3 area
8.31 m2
Terrace area
8.29 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 3/ 4 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-003-04/0030
Building
3
Floor
4
Area
61.06 m2
Number of rooms
3

Calculator

Minimum payment $

Construction progress

Construction progress in February 2023
Construction progress in February 2023
23.02.2023
Don't stop and keep building day after day! News from the ARTVILLE construction site: House 15: We continue the repair and facade work, as...

Don't stop and keep building day after day!


News from the ARTVILLE construction site:

House 15: We continue the repair and facade work, as well as the arrangement of the territory.

House 4: We received the materials and continue the glazing.

House 6: We continue to install interior partitions

Doma 21/22: Piling continues


UM-2: The 6th floor horizontal slab and the 7th floor vertical slab were poured with concrete.

UM-3: The interior walls and interior partitions of the 3rd floor were erected.


Just like a year ago, we are working to ensure that everyone who trusts us receives the keys to their own apartment and builds their life here with us. In the town of happy people.❤️

Results 2022
Results 2022
26.12.2022
It's time to sum up our work for the year and make plans for the future. Although this year has been very difficult, it has brought us new skills...
It's time to sum up our work for the year and make plans for the future.
Although this year has been very difficult, it has brought us new skills and an understanding that strength lies in unity and support.

3 turn
House #14:
In February and the beginning of March, we completed repairs in the first apartments and started commissioning already in mid-March.
During the year, 90% of the apartments in the house were handed over.

House #15:
Completed communications, rough repairs.
We are finishing the finishing of corridors, stairs and 2 floors have already been completed.
We continue repairs on the next floors.

4 turn
House #4:
We have completed the installation of windows by 60% and continue to work with the roof.
We plan to start working with ventilation.
House #5:
In 2022, the laying of external and internal walls was completed.

House #6:
We completed the monolithic structures of the house and the laying of the outer walls. Now we are laying the interior. Work is already underway on the 3rd floor!

5 turn
House #19:
Since the beginning of the year, we have completed the construction of the pile field, work with the foundation and built two floors of monolithic structures.

House #20:
We completed the construction of the pile field, work with the foundation and built three floors of monolithic structures.

Houses #21-22:
Leader drilling of piles has begun.


Houses above Urban Market
UM-1:
We completed the crushing and testing of piles.

UM-2:
Built 4.5 and 6 floors of monolithic structures.
The laying of the outer and inner walls of the 4th floor was also completed.

UM-3:
We built 5 floors of monolithic structures from 3 to 8.
The laying of the outer walls of the 3rd floor has been completed.

UM-4:
We completed the crushing and testing of piles.

Ход строительства в октябре 2022
Ход строительства в октябре 2022
20.10.2022
Октябрьские новости по строительству уже готовы! Делимся информацией о том,...
Октябрьские новости по строительству уже готовы!

Делимся информацией о том, как строился наш городок за последний месяц:

3 очередь
Дом №14:
Готовим к сдаче 1 этаж.

Дом №15:
11 этаж: устанавливаем кондиционеры. Готовим к сдаче.
10-9 этажа: монтируем плинтуса и натяжные потолки. Завершаем ремонты.
8-7 этажа: укладываем ламинат, монтируем потолок в коридорах.
6-3 этажа: укладываем плитку.
2-1 этажа: разводим сантехнику.

4 очередь
Дом №4:
Завершили монтаж окон на 3-4 этажах и 8-12 этажах.
Готовимся к установке оконных конструкций с 5 по 7 этажа.
Начали обустройство кровли.
Готовимся к устройству вентиляции.

Дом №5:
Выполняем кладку внутренних стен на 11 этаже.
Проводим подготовку к устройству кровли.
Проводим замеры для оконных конструкций.

Дом №6:
Завершили кладку стен на 12 этаже.

5 очередь
Дом №19:
Завершили опалубку перекрытия 1 этажа.
Продолжаем армирование.

Дом №20:
Продолжаем опалубку перекрытия 2 этажа.

Дома №21-22:
Готовимся к работе с полем свай.


Дома над Urban Market
UM-1:
Завершаем испытание свай.

UM-2:
Готовимся к перекрытию шестого этажа.

UM-3:
Выполнили бетонирование вертикальных конструкций 8 этажа.
Готовимся к горизонтальному перекрытию.
Завершили кладку наружных стен на третьем этаже.

UM-4:
Продолжаем давить сваи.

Stages of construction

Commissioning date I qtr. 2025
Building 3
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Ход строительства в октябре 2022

20.10.2022

Similar flats in Urban Market

Price 67 180$ ₴2 633 460
Commissioning date IV qtr. 2025
Area 100.7 m2
Price 71 750$ ₴2 812 600
Commissioning date IV qtr. 2025
Area 70.25 m2
Price 76 214$ ₴2 987 590
Commissioning date IV qtr. 2025
Area 62.66 m2
Price 78 845$ ₴3 090 730
Commissioning date III qtr. 2026
Area 64.02 m2

Similar flats in other projects

Price 66 444$ ₴2 604 610
Commissioning date IV qtr. 2024
Area 63.4 m2
Price 80 843$ ₴3 169 050
Commissioning date IV qtr. 2024
Area 77.51 m2