logo
$ USD down
  • Planning Smart flats area 24.81m2, 9a56b940-f413-11ea-ba9c-00155d42e31d.
  • Planning Smart flats area 24.81m2, 9a56b940-f413-11ea-ba9c-00155d42e31d.

Smart studio, 24.81m2

Urban Market, building 2, floor 8 ID: UM-002-08/0073
21 337$ ₴956 970

Without decoration

smart apartment Ванная
30 516$
₴1 368 650
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-002-08/0073
Building
2
Floor
8
Area
24.81 m2
Area (paid)
24.81 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Repair Ready to Use to 36 mos. from 9 277$₴416 080 from 590$₴26 470/mos.
Interest-free with decoration Repair Ready Box to 36 mos. from 9 277$₴416 080 from 570$₴25 570/mos.
Interest-free without decoration to 36 mos. from 9 277$₴416 080 from 335$₴15 030/mos.

About the flat

Specification

Flat ID
UM-002-08/0073
Building
2
Floor
8
Area
24.81 m2
Area (paid)
24.81 m2
Bathroom area
4.02 m2
Kitchen area
20.79 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 2/ 8 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-002-08/0073
Building
2
Floor
8
Area
24.81 m2

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date II qtr. 2027
Building 2
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 19 429$ ₴871 400
Commissioning date I qtr. 2028
Area 21.83 m2
Price 20 248$ ₴908 130
Commissioning date I qtr. 2028
Area 22.75 m2
Price 20 595$ ₴923 690
Commissioning date I qtr. 2028
Area 23.14 m2
Price 22 000$ ₴986 700
Commissioning date I qtr. 2028
Area 25.12 m2

Similar flats in other projects

Price 19 746$ ₴885 610
Commissioning date III qtr. 2028
Area 23.79 m2
Price 21 000$ ₴941 850
Commissioning date III qtr. 2028
Area 23.96 m2
Price 21 500$ ₴964 280
Commissioning date IV qtr. 2027
Area 22.62 m2
Price 22 000$ ₴986 700
Commissioning date III qtr. 2028
Area 22.28 m2