logo
$ USD down
  • Planning 2-rm flats area 63m2, 53051b41-364b-11eb-ba9c-00155d42e31d.
  • Planning 2-rm flats area 63m2, 53051b41-364b-11eb-ba9c-00155d42e31d.
  • Planning 2-rm flats area 63m2, 53051b41-364b-11eb-ba9c-00155d42e31d.
  • Planning 2-rm flats area 63m2, 53051b41-364b-11eb-ba9c-00155d42e31d.

2 bedroom apartment with European layout, 63m2

Urban Market, building 1, floor 8 ID: UM-001-08/0009
52 920$ ₴2 373 470

Without decoration

two-room european layout (2 bedrooms + kitchen-living room) Ванная Терраса
76 230$
₴3 418 920
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-001-08/0009
Building
1
Floor
8
Number of rooms
2
Area
63.00 m2
Area (paid)
63.00 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Repair Ready to Use to 48 mos. from 23 174$₴1 039 360 from 1 106$₴49 610/mos.
Interest-free with decoration Repair Ready Box to 48 mos. from 23 174$₴1 039 360 from 1 066$₴47 820/mos.
Interest-free without decoration to 48 mos. from 23 174$₴1 039 360 from 620$₴27 810/mos.

About the flat

Хотите жить в уютном городке со всей необходимой инфраструктурой? Тогда переезжайте в квартиру UM-001-08/0009 в жилом городке Urban Market. Она расположена на этаже этаже в доме №1.

В кухне-студии, площадью 24.19 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

Площадь санузла — 3.43 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 5.84 м2.

Терраса, площадью 35.03 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день наблюдать за Солнцем, заходящим за горизонт живописной украинской степи.

Specification

Flat ID
UM-001-08/0009
Building
1
Floor
8
Area
63.00 m2
Area (paid)
63.00 m2
Number of rooms
2
Bathroom area
3.43 m2
Corridor area
5.84 m2
Kitchen area
24.19 m2
Room area
9.51 m2
Room 2 area
9.52 m2
Terrace area
35.03 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 1/ 8 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-001-08/0009
Building
1
Floor
8
Area
63.00 m2
Number of rooms
2

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2028
Building 1
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 48 100$ ₴2 157 290
Commissioning date IV qtr. 2028
Area 46.66 m2
Price 49 392$ ₴2 215 240
Commissioning date I qtr. 2028
Area 40.83 m2
Price 51 988$ ₴2 331 670
Commissioning date IV qtr. 2028
Area 61.89 m2
Price 53 978$ ₴2 420 920
Commissioning date IV qtr. 2028
Area 64.26 m2

Similar flats in other projects

Price 50 000$ ₴2 242 500
Commissioning date III qtr. 2028
Area 47.88 m2
Price 51 000$ ₴2 287 350
Commissioning date III qtr. 2028
Area 47.88 m2
Price 54 000$ ₴2 421 900
Commissioning date I qtr. 2027
Area 48.93 m2
Price 55 000$ ₴2 466 750
Commissioning date III qtr. 2028
Area 40.39 m2