Construction progress

Keks construction progress. Quarterly report
Keks construction progress. Quarterly report
24.01.2024
Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings -...

Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings - the concrete has arrived, the grillwork has been poured, and the windows have already arrived, the windows have been accepted (and the quality must be checked!), and here is a new batch of bricks. And so almost every day. But we don't complain, on the contrary, we brag! Because KEKS is under construction. To the anger of the enemies and to the joy of my mother.

Watch the video report from the KEKS construction site: we show how many materials arrive, how we build and which apartments we rent to investors. Also, follow the news on the website and in social networks - we regularly publish reports on the progress of construction and the life of the town. A lot of interesting things await you this year.

House №8: new delivery
House №8: new delivery
18.08.2023
A new batch of floor slabs was brought to the construction site - these are reinforced concrete structures that are laid between floors. This means...

A new batch of floor slabs was brought to the construction site - these are reinforced concrete structures that are laid between floors. This means that the next floor in building No. 8 will soon be ready. The work has begun. Follow our news.

Stages of construction

Commissioning date IV qtr. 2024
Building 8
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

House №8: new delivery

18.08.2023

House No. 8 of the second stage of construction is built of red brick. Partitions between apartments and rooms are made of high-quality aerated concrete. The building differs from other new buildings in Odessa:

  • There is an elevator, which, according to building regulations, is not mandatory for a five-story building.
  • Spacious basement with storerooms and free space for strollers, bicycles and electric scooters
  • Heating in front rooms
  • Individual heating in each apartment.

Residents of the house have access to a closed yard. There is no car in it. All the conditions for recreation and sports are created here.