logo
square E-STORE
$ USD down
3D
  • Planning 2-rm flats area 46.56m2, KS-025-02/0006.
  • Planning 2-rm flats area 46.56m2, KS-025-02/0006.

Двух комнатная квартира, 46.56м2

Keks, building 25, floor 2 ID: KS-025-02/0006
40 834$ ₴1 749 740

Without decoration

two-room european layout (2 bedrooms + kitchen-living room) Ванная Park
40 834$
₴1 749 740
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
KS-025-02/0006
Building
25
Floor
2
Number of rooms
2
Area
46.56 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Basic-full to 48 mos. from 16 497$₴706 900 from 265$₴11 360/mos.
Super light with decoration Basic-full to 60 mos. from 4 247$₴181 990 from 763$₴32 700/mos.
Super light without decoration to 60 mos. from 4 247$₴181 990 from 302$₴12 950/mos.
Interest-free without decoration to 48 mos. from 16 497$₴706 900 from 280$₴12 000/mos.

About the flat

Хотите жить в уютном городке со всей необходимой инфраструктурой? Тогда переезжайте в квартиру KS-025-02/0006 в жилом городке Keks. Она расположена на этаже этаже в доме №25.

При покупке квартиры в комплектации full, в вашей кухне-студии, площадью 15.04 м2, будет сразу установлена кухонная мебель, вытяжка, духовка, варочная поверхность и вся сантехника.

В санузле, площадью 4.33 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Комнаты объединяет коридор, площадью 5.89 м2.

Выделенная застекленная лоджия, площадью 2.50 м2 — это ваша дополнительная комната. Здесь есть отопление, освещение и несколько розеток – обустройте себе зону для отдыха или установите мебель для работы и учебы. На запад стороне, на которой расположена лоджия, вы будете ежедневно наслаждаться Солнцем, заходящим за горизонт живописной украинской степи.

Specification

Flat ID
KS-025-02/0006
Building
25
Floor
2
Area
46.56 m2
Number of rooms
2
Bathroom area
4.33 m2
Corridor area
5.89 m2
Kitchen area
15.04 m2
Loggia area
2.50 m2
Room area
11.65 m2
Room 2 area
7.15 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Keks/ Building 25/ 2 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
KS-025-02/0006
Building
25
Floor
2
Area
46.56 m2
Number of rooms
2

Calculator

Minimum payment $

Construction progress

How we build KEKS: early September
How we build KEKS: early September
20.09.2024
We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the...

We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the construction site into a real town of the future.

Every brick, every floor slab, every meter of laid communications is the result of the painstaking work of our builders, who put their soul and professionalism into their work. We use only the highest quality materials from proven suppliers to ensure the reliability and durability of each house.

We recently received a large batch of bricks, which allowed us to accelerate the pace of construction of load-bearing walls. In parallel, the construction of external walls has already been completed, which gives the complexes a finished look. The installation of floor slabs is in full swing, creating a solid frame for future apartments.

We pay special attention to engineering systems. The delivery of plumbing has already been completed, and we are preparing for its installation. This ensures that each apartment will be equipped with modern communications that provide comfort and convenience of living. We understand how important comfort and safety are for each client. Therefore, in addition to high quality construction, we also take care of creating a pleasant microclimate in each apartment. The modern energy-saving technologies that we use will reduce heating and air conditioning costs, as well as preserve the environment. We are confident that the KEKS residential complex will become a real pearl and will give its residents coziness, comfort and joy of living in a modern and safe home. Follow our updates so as not to miss important events and become one of the first owners of an apartment in the KEKS residential complex.

Keks construction progress. Quarterly report
Keks construction progress. Quarterly report
24.01.2024
Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings -...

Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings - the concrete has arrived, the grillwork has been poured, and the windows have already arrived, the windows have been accepted (and the quality must be checked!), and here is a new batch of bricks. And so almost every day. But we don't complain, on the contrary, we brag! Because KEKS is under construction. To the anger of the enemies and to the joy of my mother.

Watch the video report from the KEKS construction site: we show how many materials arrive, how we build and which apartments we rent to investors. Also, follow the news on the website and in social networks - we regularly publish reports on the progress of construction and the life of the town. A lot of interesting things await you this year.

Stages of construction

Commissioning date IV qtr. 2026
Building 25
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Quality control of repair work

15.01.2024

Similar flats in Keks

Price 39 931$ ₴1 716 240
Commissioning date III qtr. 2026
Area 41.04 m2
Price 40 450$ ₴1 738 550
Commissioning date III qtr. 2026
Area 40.81 m2
Price 41 353$ ₴1 777 360
Commissioning date IV qtr. 2026
Area 42.76 m2
Price 42 723$ ₴1 836 240
Commissioning date III qtr. 2026
Area 49.62 m2

Similar flats in other projects

Price 36 884$ ₴1 585 280
Commissioning date II qtr. 2025
Area 41.37 m2
Price 39 000$ ₴1 676 220
Commissioning date I qtr. 2026
Area 47.26 m2
Price 40 300$ ₴1 732 100
Commissioning date II qtr. 2025
Area 41.37 m2
Price 43 500$ ₴1 869 630
Commissioning date II qtr. 2025
Area 56.6 m2