Construction progress

Permits

GASI certificate on commissioning of house No.7
The decision to assign an address to house No.7
Лицензия на создание объектов архитектуры
Permission to perform construction works dated 11/14/2017
Permission to perform construction works dated 25.01.2019
Разрешение на выполнение строительных работ от 12.08.2021

Stages of construction

Commissioning date I qtr. 2021
Building 7
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

House No. 7 is one of the first houses in ARTVILLE that was commissioned. It is located in a convenient location, close to all necessary infrastructure facilities. Also, house No. 7 is one of the 4 houses in ARTVILLE, which are decorated with bright murals, which have become a kind of business card of the town.

Apartments in building No. 7 have a high level of comfort. Everything you need for a comfortable and pleasant life is here:

  • Autonomous heating that provides a comfortable microclimate in any weather.
  • Free stroller, which allows you to store strollers and bicycles outside the apartment.
  • Thermal insulation of the facade and roof, which ensures low heating costs.
  • A security system that includes video surveillance, a sheriff's service and a group of sensors.

House No. 7 is a great option for those who value comfort and convenience. The apartments in this new building were sold under the best conditions in Odessa, but there are still several vacant offers in other ARTVILLE buildings.