logo
square E-STORE
$ USD down

Storeroom, 4.5m2

Artville, building 6, floor -1 ID: AB-06-м1/К0018
3 375$ ₴145 060

Without decoration

Storeroom ID
AB-06-м1/К0018
Building
6
Floor
-1
Area
4.50 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Basic-full to 36 mos. from 1 364$₴58 630 from 0$₴0/mos.
Interest-free with decoration Basic-light to 36 mos. from 1 364$₴58 630 from 0$₴0/mos.
Interest-free without decoration to 36 mos. from 1 364$₴58 630 from 0$₴0/mos.

About the storeroom

Кладовка AB-06-м1/К0018 расположена в жилом городке Artville на -1 этаже дома №6. Это помещение, площадью 4.50 м2.

Используйте эту кладовку для хранения сезонных вещей, закруток, зимней или летней резины. Для удобства использования, сюда проведено освещение.

Specification

Storeroom ID
AB-06-м1/К0018
Building
6
Floor
-1
Area
4.50 m2

Floor location

Artville/ Building 6/ -1 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-06-м1/К0018
Building
6
Floor
-1
Area
4.50 m2

Calculator

Minimum payment $

Construction progress

ARTVILLE - installation of window structures, building #5
ARTVILLE - installation of window structures, building #5
09.01.2025
We start the year with great news from building #5! We are installing window structures on the 7th floor. The work is carried out in stages and in...

We start the year with great news from building #5!

We are installing window structures on the 7th floor. The work is carried out in stages and in accordance with the technology.

Follow our news to stay up to date!

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

Stages of construction

Commissioning date III qtr. 2025
Building 6
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - preparation for handing over the keys, house #15

07.11.2024