logo
square E-STORE
$ USD down

Двух комнатная квартира, 55.93м2

Artville, building 6, floor 9 ID: AB-06-09/00010
two-room apartment Ванная Кладовка
Flat ID
AB-06-09/00010
Building
6
Floor
9
Number of rooms
2
Area
55.93 m2

About the flat

Квартира AB-06-09/00010 находится на 9 этаже в доме №6 жилого городка Artville.

У вас будет достаточно просторная кухня, площадью 19.39 м2. Здесь комфортно обедать всей семьей.

В квартире 2 санузла. В первом, площадью 2.70 м2, предусмотрено место под ванную. Второй санузел, площадью 3.61 м2 — гостевой, с душевой кабиной и другой сантехникой. Здесь же можно разместить стиральную машинку.

Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 7.99 м2.

В этой квартире есть кладовая, площадью 1.08 м2. Для вашего удобства сюда проведено освещение.

Specification

Flat ID
AB-06-09/00010
Building
6
Floor
9
Area
55.93 m2
Number of rooms
2
Bathroom area
3.61 m2
Corridor area
7.99 m2
Kitchen area
19.39 m2
Room area
10.64 m2
Room 2 area
10.52 m2
Storeroom area
1.08 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 6/ 9 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-06-09/00010
Building
6
Floor
9
Area
55.93 m2
Number of rooms
2

Construction progress

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

ARTVILLE - interior work, building #15
ARTVILLE - interior work, building #15
19.09.2024
We are actively continuing interior work in building #15 We have completed the installation of stretch ceilings and wallpapering in the apartments...

We are actively continuing interior work in building #15

We have completed the installation of stretch ceilings and wallpapering in the apartments on the 1st and 2nd floors. We are also equipping the apartments on the 4th floor with kitchen furniture and plumbing.

By the way, a mailbox and bulletin boards have already been installed in the entrance area

Stages of construction

Commissioning date III qtr. 2025
Building 6
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - interior work, building #15

19.09.2024

Similar flats in Artville

Price 50 000$ ₴2 112 500
Commissioning date II qtr. 2026
Area 48.36 m2
Price 51 000$ ₴2 154 750
Commissioning date II qtr. 2026
Area 48.36 m2
Price 54 000$ ₴2 281 500
Commissioning date II qtr. 2026
Area 48.36 m2
Price 55 000$ ₴2 323 750
Commissioning date II qtr. 2026
Area 40.39 m2

Similar flats in other projects

Price 48 330$ ₴2 041 950
Commissioning date IV qtr. 2026
Area 46.73 m2
Price 49 392$ ₴2 086 820
Commissioning date I qtr. 2026
Area 44.07 m2
Price 50 002$ ₴2 112 590
Commissioning date IV qtr. 2026
Area 44.93 m2
Price 50 002$ ₴2 112 590
Commissioning date IV qtr. 2026
Area 44.93 m2