logo
square E-STORE
$ USD down

2-комнатная квартира с европланировкой, 53.77м2

Artville, building 6, floor 10 ID: AB-06-10/00004
50 000$ ₴2 127 500

Assigment

two-room european layout (2 bedrooms + kitchen-living room) Ванная Field
50 000$
₴2 127 500
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
AB-06-10/00004
Building
6
Floor
10
Number of rooms
2
Area
53.77 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Basic-full to 36 mos. from 20 200$₴859 510 from 546$₴23 240/mos.
Interest-free with decoration Basic-light to 36 mos. from 20 200$₴859 510 from 486$₴20 680/mos.
Interest-free without decoration to 36 mos. from 20 200$₴859 510 from 569$₴24 220/mos.

About the flat

AB-06-10/00004 — это квартира в жилом городке Artville, расположенная на 10 этаже в доме №6.

При покупке квартиры в комплектации full, в вашей кухне-студии, площадью 25.21 м2, будет сразу установлена кухонная мебель, вытяжка, духовка, варочная поверхность и вся сантехника.

В квартире 2 санузла. В первом, площадью 3.70 м2, предусмотрено место под ванную. Второй санузел, площадью 4.35 м2 — гостевой, с душевой кабиной и другой сантехникой. Здесь же можно разместить стиральную машинку.

Остекленная лоджия 2.99 м2 хорошо сохраняет температуру, благодаря качественным стеклопакетам. Она может превратиться в рабочее место школьника, личный кабинет или комфортную лаунж-зону с креслами-мешками. Вы каждый день будете наблюдать за Солнцем, заходящим за горизонт живописной украинской степи, потому что лоджия выходит на запад сторону.

Specification

Flat ID
AB-06-10/00004
Building
6
Floor
10
Area
53.77 m2
Number of rooms
2
Bathroom area
4.35 m2
Kitchen area
25.21 m2
Loggia area
2.99 m2
Room area
6.89 m2
Room 2 area
10.63 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 6/ 10 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-06-10/00004
Building
6
Floor
10
Area
53.77 m2
Number of rooms
2

Calculator

Minimum payment $

Construction progress

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

ARTVILLE - window installation, building #5
ARTVILLE - window installation, building #5
10.10.2024
There is progress in building #5! We are completing the installation of windows on the 8th floor. So now we are looking forward to a new batch of...

There is progress in building #5!

We are completing the installation of windows on the 8th floor.

So now we are looking forward to a new batch of windows for the 7th floor, to continue the work, bringing the project closer to a new stage!

Stages of construction

Commissioning date III qtr. 2025
Building 6
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - window installation, building #5

10.10.2024

Similar flats in Artville

Price 43 853$ ₴1 865 950
Commissioning date I qtr. 2026
Area 56.22 m2
Price 45 000$ ₴1 914 750
Commissioning date II qtr. 2026
Area 51.14 m2
Price 50 000$ ₴2 127 500
Commissioning date II qtr. 2026
Area 48.36 m2
Price 51 000$ ₴2 170 050
Commissioning date II qtr. 2026
Area 48.36 m2

Similar flats in other projects

Price 48 330$ ₴2 056 450
Commissioning date IV qtr. 2026
Area 46.73 m2
Price 49 392$ ₴2 101 630
Commissioning date I qtr. 2026
Area 44.07 m2
Price 50 002$ ₴2 127 590
Commissioning date IV qtr. 2026
Area 44.93 m2
Price 50 002$ ₴2 127 590
Commissioning date IV qtr. 2026
Area 44.93 m2