Construction progress

Permits

GASI certificate on commissioning of house No.3
The decision to assign an address to house No.3
Лицензия на создание объектов архитектуры
Permission to perform construction works dated 11/14/2017
Permission to perform construction works dated 25.01.2019
Разрешение на выполнение строительных работ от 12.08.2021

Stages of construction

Commissioning date II qtr. 2022
Building 3
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

House No. 3 belongs to the 2nd phase of construction. It was handed over and occupied in the 2nd quarter of 2020. 500+ new residents settled here, and commercial premises are already bringing profit to their owners.

The apartments in the building are rented with ready repairs, appliances and partial furniture. The house has autonomous heating. And during a power outage, it is connected to the town's generators.