logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 28.29m2, AB-21-14/00114.
  • Planning 1-rm flats area 28.29m2, AB-21-14/00114.

1-rm flats, 28.29m2

Artville, building 21, floor 14 ID: AB-21-14/00114
25 122$ ₴1 067 690

Without decoration

one-room apartment Ванная Кладовка
28 800$
₴1 224 000
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
AB-21-14/00114
Building
21
Floor
14
Number of rooms
1
Area
28.29 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 2 995$₴127 290 from 538$₴22 870/mos.
Interest-free with decoration Basic-full to 48 mos. from 11 635$₴494 490 from 358$₴15 220/mos.
Super light with decoration Basic-light to 60 mos. from 2 995$₴127 290 from 519$₴22 060/mos.
Interest-free with decoration Basic-light to 48 mos. from 11 635$₴494 490 from 164$₴6 970/mos.
Super light without decoration to 60 mos. from 2 995$₴127 290 from 379$₴16 110/mos.
Interest-free without decoration to 48 mos. from 11 635$₴494 490 from 196$₴8 330/mos.

About the flat

AB-21-14/00114 — это квартира в жилом городке Artville, расположенная на 14 этаже в доме №21.

У вас будет достаточно просторная кухня, площадью 12.83 м2. Здесь комфортно обедать всей семьей.

В санузле, площадью 3.37 м2, расположена удобная душевая кабина. Также мы позаботились о том, чтобы здесь поместилась стандартная стиральная машина.

Комнаты объединяет коридор, площадью 2.88 м2.

В этой квартире есть кладовая, площадью 1.27 м2. Для вашего удобства сюда проведено освещение.

Specification

Flat ID
AB-21-14/00114
Building
21
Floor
14
Area
28.29 m2
Number of rooms
1
Bathroom area
3.37 m2
Corridor area
2.88 m2
Kitchen area
12.83 m2
Room area
7.94 m2
Storeroom area
1.27 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 21/ 14 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-21-14/00114
Building
21
Floor
14
Area
28.29 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

ARTVILLE - installation of window structures, building #5
ARTVILLE - installation of window structures, building #5
09.01.2025
We start the year with great news from building #5! We are installing window structures on the 7th floor. The work is carried out in stages and in...

We start the year with great news from building #5!

We are installing window structures on the 7th floor. The work is carried out in stages and in accordance with the technology.

Follow our news to stay up to date!

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

Stages of construction

Commissioning date II qtr. 2026
Building 21
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - preparation for handing over the keys, house #15

07.11.2024

Similar flats in Artville

Price 25 000$ ₴1 062 500
Commissioning date II qtr. 2026
Area 30.48 m2
Price 25 500$ ₴1 083 750
Commissioning date II qtr. 2026
Area 26.27 m2
Price 25 500$ ₴1 083 750
Commissioning date II qtr. 2026
Area 30.24 m2
Price 27 000$ ₴1 147 500
Commissioning date II qtr. 2026
Area 29.62 m2

Similar flats in other projects

Price 23 500$ ₴998 750
Commissioning date I qtr. 2026
Area 32.4 m2
Price 25 399$ ₴1 079 460
Commissioning date I qtr. 2026
Area 34.26 m2
Price 25 520$ ₴1 084 600
Commissioning date II qtr. 2025
Area 32.51 m2
Price 26 803$ ₴1 139 130
Commissioning date II qtr. 2025
Area 25.22 m2