logo
square E-STORE
$ USD down
3D
  • Planning Smart flats area 22.11m2, AB-21-14/00105.
  • Planning Smart flats area 22.11m2, AB-21-14/00105.

Smart flats, 22.11m2

Artville, building 21, floor 14 ID: AB-21-14/00105
19 634$ ₴837 400

Without decoration

smart apartment Ванная
22 508$
₴959 970
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
AB-21-14/00105
Building
21
Floor
14
Area
22.11 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 2 341$₴99 850 from 421$₴17 960/mos.
Interest-free with decoration Basic-full to 48 mos. from 9 093$₴387 820 from 280$₴11 950/mos.
Super light with decoration Basic-light to 60 mos. from 2 341$₴99 850 from 405$₴17 280/mos.
Interest-free with decoration Basic-light to 48 mos. from 9 093$₴387 820 from 128$₴5 460/mos.
Super light without decoration to 60 mos. from 2 341$₴99 850 from 296$₴12 630/mos.
Interest-free without decoration to 48 mos. from 9 093$₴387 820 from 153$₴6 530/mos.

About the flat

AB-21-14/00105 — это квартира в жилом городке Artville, расположенная на 14 этаже в доме №21.

Начните самостоятельную жизнь в SMART-студии, площадью22.11 м2. Она максимально доступна по стоимости и требует минимум ухода и расходов на содержание.

У вас будет кухня-студия, площадью 14.82 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

В санузле, площадью 3.68 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Комнаты объединяет коридор, площадью 3.61 м2.

Specification

Flat ID
AB-21-14/00105
Building
21
Floor
14
Area
22.11 m2
Bathroom area
3.68 m2
Corridor area
3.61 m2
Kitchen area
14.82 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 21/ 14 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-21-14/00105
Building
21
Floor
14
Area
22.11 m2

Calculator

Minimum payment $

Construction progress

ARTVILLE - installation of window structures, building #5
ARTVILLE - installation of window structures, building #5
09.01.2025
We start the year with great news from building #5! We are installing window structures on the 7th floor. The work is carried out in stages and in...

We start the year with great news from building #5!

We are installing window structures on the 7th floor. The work is carried out in stages and in accordance with the technology.

Follow our news to stay up to date!

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

Stages of construction

Commissioning date II qtr. 2026
Building 21
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - preparation for handing over the keys, house #15

07.11.2024

Similar flats in Artville

Price 17 700$ ₴754 910
Commissioning date II qtr. 2026
Area 23.96 m2
Price 19 000$ ₴810 350
Commissioning date II qtr. 2026
Area 19.17 m2
Price 20 228$ ₴862 730
Commissioning date II qtr. 2026
Area 22.55 m2
Price 20 228$ ₴862 730
Commissioning date II qtr. 2026
Area 22.55 m2

Similar flats in other projects

Price 18 500$ ₴789 030
Commissioning date IV qtr. 2024
Area 16.88 m2
Price 20 000$ ₴853 000
Commissioning date II qtr. 2025
Area 24.83 m2
Price 20 800$ ₴887 120
Commissioning date II qtr. 2025
Area 19.14 m2
Price 21 000$ ₴895 650
Commissioning date III qtr. 2026
Area 22.52 m2