logo
square E-STORE
$ USD down

Двух-комнатная квартира, 46.44м2

Artville, building 19, floor 13 ID: AB-19-13/00108
39 753$ ₴1 709 380

Without decoration

two-room european layout (2 bedrooms + kitchen-living room) Ванная
45 790$
₴1 968 970
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
AB-19-13/00108
Building
19
Floor
13
Number of rooms
2
Area
46.44 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 4 762$₴204 770 from 855$₴36 770/mos.
Interest-free with decoration Basic-full to 48 mos. from 18 499$₴795 460 from 569$₴24 470/mos.
Super light with decoration Basic-light to 60 mos. from 4 762$₴204 770 from 823$₴35 390/mos.
Interest-free with decoration Basic-light to 48 mos. from 18 499$₴795 460 from 250$₴10 750/mos.
Super light without decoration to 60 mos. from 4 762$₴204 770 from 595$₴25 590/mos.
Interest-free without decoration to 48 mos. from 18 499$₴795 460 from 303$₴13 030/mos.

About the flat

AB-19-13/00108 — это квартира в жилом городке Artville, расположенная на 13 этаже в доме №19.

Из 2-комнатной квартиры открывается вид на парк. Расположение комнат на восточной стороне позволяет каждый день наблюдать за тихими и живописными рассветами.

При покупке квартиры в комплектации full, в вашей кухне-студии, площадью 23.47 м2, будет сразу установлена кухонная мебель, вытяжка, духовка, варочная поверхность и вся сантехника.

Площадь санузла — 3.29 м2. Здесь помещается душевая кабина, вся необходимая сантехника и стиральная машина.

Specification

Flat ID
AB-19-13/00108
Building
19
Floor
13
Area
46.44 m2
Number of rooms
2
Bathroom area
3.29 m2
Kitchen area
23.47 m2
Room area
12.06 m2
Room 2 area
7.62 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 19/ 13 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-19-13/00108
Building
19
Floor
13
Area
46.44 m2
Number of rooms
2

Calculator

Minimum payment $

Construction progress

ARTVILLE - installation of window structures, building #5
ARTVILLE - installation of window structures, building #5
09.01.2025
We start the year with great news from building #5! We are installing window structures on the 7th floor. The work is carried out in stages and in...

We start the year with great news from building #5!

We are installing window structures on the 7th floor. The work is carried out in stages and in accordance with the technology.

Follow our news to stay up to date!

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

Stages of construction

Commissioning date I qtr. 2026
Building 19
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - preparation for handing over the keys, house #15

07.11.2024

Similar flats in Artville

Price 39 304$ ₴1 690 080
Commissioning date II qtr. 2026
Area 46.87 m2
Price 39 304$ ₴1 690 080
Commissioning date II qtr. 2026
Area 46.87 m2
Price 42 376$ ₴1 822 170
Commissioning date II qtr. 2026
Area 51.14 m2
Price 42 376$ ₴1 822 170
Commissioning date II qtr. 2026
Area 51.14 m2

Similar flats in other projects

Price 36 884$ ₴1 586 020
Commissioning date II qtr. 2025
Area 41.37 m2
Price 39 000$ ₴1 677 000
Commissioning date I qtr. 2026
Area 47.26 m2
Price 40 300$ ₴1 732 900
Commissioning date II qtr. 2025
Area 41.37 m2
Price 43 500$ ₴1 870 500
Commissioning date II qtr. 2025
Area 56.6 m2