logo
square E-STORE
$ USD down
3D
  • Planning Storeroom area 1.98m2, AB-17-м1/К0002.
  • Planning Storeroom area 1.98m2, AB-17-м1/К0002.

Storeroom, 1.98m2

Artville, building 17, floor -1 ID: AB-17-м1/К0002
1 485$ ₴61 860

Without decoration

Storeroom ID
AB-17-м1/К0002
Building
17
Floor
-1
Area
1.98 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 154$₴6 420 from 23$₴960/mos.
Interest-free with decoration Basic-full to 48 mos. from 600$₴24 990 from 19$₴800/mos.
Super light with decoration Basic-light to 60 mos. from 154$₴6 420 from 0$₴0/mos.
Interest-free with decoration Basic-light to 48 mos. from 600$₴24 990 from 0$₴0/mos.
Super light without decoration to 60 mos. from 154$₴6 420 from 0$₴0/mos.
Interest-free without decoration to 48 mos. from 600$₴24 990 from 0$₴0/mos.

About the storeroom

Кладовка AB-17-м1/К0002, площадью 1.98 м2 расположена в доме №17 жилого городка Artville. Помещение удобно расположено — на -1 этаже.

Оставьте максимум пространства для жизни в своей квартире — берите кладовку. Здесь можно хранить нескоропортящиеся продукты, закрутки, инвентарь для зимних или летних видов спорта.

Specification

Storeroom ID
AB-17-м1/К0002
Building
17
Floor
-1
Area
1.98 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 17/ -1 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-17-м1/К0002
Building
17
Floor
-1
Area
1.98 m2

Calculator

Minimum payment $

Construction progress

Permits

Лицензия на создание объектов архитектуры
Permission to perform construction works dated 11/14/2017
Permission to perform construction works dated 25.01.2019
Разрешение на выполнение строительных работ от 12.08.2021

Stages of construction

Commissioning date IV qtr. 2026
Building 17
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Monolithic works

20.12.2023