  • Planning 1-rm flats area 34.58m2, UM-006-04/0021.
  • Planning 1-rm flats area 34.58m2, UM-006-04/0021.

1-комнатная квартира с европланировкой, 39.09м2

Urban Market, building 6, floor 4 ID: UM-006-04/0021
44 954$ ₴1 894 820

Without decoration

one-room european layout (bedroom + kitchen-living room) Ванная Балкон
51 870$
₴2 186 330
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-006-04/0021
Building
6
Floor
4
Number of rooms
1
Area
39.09 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 5 394$₴227 360 from 968$₴40 810/mos.
Interest-free with decoration Basic-full to 48 mos. from 20 955$₴883 260 from 645$₴27 190/mos.
Super light with decoration Basic-light to 60 mos. from 5 394$₴227 360 from 945$₴39 840/mos.
Interest-free with decoration Basic-light to 48 mos. from 20 955$₴883 260 from 364$₴15 350/mos.
Super light without decoration to 60 mos. from 5 394$₴227 360 from 732$₴30 860/mos.
Interest-free without decoration to 48 mos. from 20 955$₴883 260 from 403$₴16 990/mos.

About the flat

Хотите жить в уютном городке со всей необходимой инфраструктурой? Тогда переезжайте в квартиру UM-006-04/0021 в жилом городке Urban Market. Она расположена на этаже этаже в доме №6.

У вас будет кухня-студия, площадью 11.43 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

Площадь санузла — 3.78 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Комнаты объединяет коридор, площадью 4.99 м2.

Балкон, площадью 6.44 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день наблюдать за яркими рассветами.

Specification

Flat ID
UM-006-04/0021
Building
6
Floor
4
Area
39.09 m2
Number of rooms
1
Balcony area
6.44 m2
Bathroom area
3.78 m2
Corridor area
4.99 m2
Kitchen area
11.43 m2
Room area
12.45 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 6/ 4 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-006-04/0021
Building
6
Floor
4
Area
39.09 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date III qtr. 2026
Building 6
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 40 500$ ₴1 707 080
Commissioning date II qtr. 2025
Area 34.39 m2
Price 42 445$ ₴1 789 060
Commissioning date I qtr. 2026
Area 32.5 m2
Price 47 117$ ₴1 985 990
Commissioning date II qtr. 2025
Area 36.26 m2
Price 48 324$ ₴2 036 860
Commissioning date II qtr. 2025
Area 37.46 m2

Similar flats in other projects

Price 41 996$ ₴1 770 140
Commissioning date I qtr. 2026
Area 37.24 m2
Price 42 000$ ₴1 770 300
Commissioning date II qtr. 2026
Area 36.66 m2
Price 43 413$ ₴1 829 860
Commissioning date I qtr. 2026
Area 39.72 m2
Price 45 828$ ₴1 931 660
Commissioning date I qtr. 2026
Area 38.92 m2