logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 32.1m2, UM-004-05/0014.
  • Planning 1-rm flats area 32.1m2, UM-004-05/0014.

Одно комнатная квартира, 37.28м2

Urban Market, building 4, floor 5 ID: UM-004-05/0014
one-room apartment Ванная Балкон
Flat ID
UM-004-05/0014
Building
4
Floor
5
Number of rooms
1
Area
37.28 m2

About the flat

Квартира UM-004-05/0014 находится на 5 этаже в доме №4 жилого городка Urban Market.

У вас будет достаточно просторная кухня, площадью 11.68 м2. Здесь комфортно обедать всей семьей.

В санузле, площадью 3.88 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Комнаты объединяет коридор, площадью 4.54 м2.

Балкон 7.40 м2 может превратиться в комфортную лаунж-зону с креслами-мешками. Вы каждый день будете [преимущество стороны света], потому что он выходит на юго-восток сторону.

Specification

Flat ID
UM-004-05/0014
Building
4
Floor
5
Area
37.28 m2
Number of rooms
1
Balcony area
7.40 m2
Bathroom area
3.88 m2
Corridor area
4.54 m2
Kitchen area
11.68 m2
Room area
9.78 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 4/ 5 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-004-05/0014
Building
4
Floor
5
Area
37.28 m2
Number of rooms
1

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2026
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 40 000$ ₴1 686 000
Commissioning date II qtr. 2025
Area 26.62 m2
Price 40 000$ ₴1 686 000
Commissioning date I qtr. 2026
Area 41.16 m2
Price 40 500$ ₴1 707 080
Commissioning date II qtr. 2025
Area 34.39 m2
Price 42 445$ ₴1 789 060
Commissioning date I qtr. 2026
Area 32.5 m2

Similar flats in other projects

Price 38 000$ ₴1 601 700
Commissioning date II qtr. 2026
Area 34.84 m2
Price 39 400$ ₴1 660 710
Commissioning date II qtr. 2026
Area 30.48 m2
Price 40 000$ ₴1 686 000
Commissioning date II qtr. 2026
Area 32.79 m2
Price 42 000$ ₴1 770 300
Commissioning date II qtr. 2026
Area 36.66 m2