logo
square E-STORE
$ USD down
3D
  • Planning 3-rm flats area 67.82m2, UM-004-05/0008.
  • Planning 3-rm flats area 67.82m2, UM-004-05/0008.

3-комнатная квартира с европланировкой, 89.59м2

Urban Market, building 4, floor 5 ID: UM-004-05/0008
three-room european layout (3 bedrooms + kitchen-living room) Ванная Терраса
Flat ID
UM-004-05/0008
Building
4
Floor
5
Number of rooms
3
Area
89.59 m2

About the flat

Квартира UM-004-05/0008 находится на 5 этаже в доме №4 жилого городка Urban Market.

Любуйтесь ежедневно на [вид из окна] из своей 3-комнатной квартиры. Расположение на [сторона света М] стороне дает ей дополнительное преимущество: вы можете каждый день [преимущество стороны света].

При покупке квартиры в комплектации full, в вашей кухне-студии, площадью 20.92 м2, будет сразу установлена кухонная мебель, вытяжка, духовка, варочная поверхность и вся сантехника.

2 санузла расположены в разных концах квартиры. Площадь первого — 2.45 м2. Он рассчитан на установку ванны. Второй санузел — меньше, он имеет площадь 3.65 м2. Здесь можно разместить душевую кабину и стиральную машину.

Комнаты объединяет коридор, площадью 4.09 м2.

Терраса 31.10 м2 может превратиться в комфортную лаунж-зоны с креслами-мешками и уличной мебелью. Вы каждый день будете [преимущество стороны света], потому что она выходит на юго-восток сторону.

Specification

Flat ID
UM-004-05/0008
Building
4
Floor
5
Area
89.59 m2
Number of rooms
3
Bathroom area
2.45 m2
Corridor area
4.09 m2
Kitchen area
20.92 m2
Room area
9.00 m2
Room 2 area
8.71 m2
Room 3 area
9.67 m2
Terrace area
31.10 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 4/ 5 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-004-05/0008
Building
4
Floor
5
Area
89.59 m2
Number of rooms
3

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2026
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 81 498$ ₴3 435 150
Commissioning date III qtr. 2026
Area 63.72 m2

Similar flats in other projects

Price 83 000$ ₴3 498 450
Commissioning date II qtr. 2026
Area 78.41 m2