logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 38.09m2, UM-004-04/0016.
  • Planning 1-rm flats area 38.09m2, UM-004-04/0016.

1 комнатная квартира, 43.92м2

Urban Market, building 4, floor 4 ID: UM-004-04/0016
40 000$ ₴1 688 000

Assigment

one-room apartment Ванная Балкон Кладовка
40 000$
₴1 688 000
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-004-04/0016
Building
4
Floor
4
Number of rooms
1
Area
43.92 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 4 160$₴175 560 from 1 080$₴45 580/mos.
Interest-free with decoration Basic-full to 48 mos. from 16 160$₴681 960 from 837$₴35 330/mos.
Super light with decoration Basic-light to 60 mos. from 4 160$₴175 560 from 1 054$₴44 480/mos.
Interest-free with decoration Basic-light to 48 mos. from 16 160$₴681 960 from 528$₴22 290/mos.
Super light without decoration to 60 mos. from 4 160$₴175 560 from 820$₴34 610/mos.
Interest-free without decoration to 48 mos. from 16 160$₴681 960 from 572$₴24 140/mos.

About the flat

Квартира UM-004-04/0016 находится на 4 этаже в доме №4 жилого городка Urban Market.

У вас будет достаточно просторная кухня, площадью 13.17 м2. Здесь комфортно обедать всей семьей.

В санузле, площадью 3.96 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 5.55 м2.

В кладовку, площадью 2.56 м2, проведено освещение. Здесь удобно хранить сезонные вещи и продукты.

Балкон, площадью 8.33 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день наслаждаться легкой прохладой даже в жаркий день.

Specification

Flat ID
UM-004-04/0016
Building
4
Floor
4
Area
43.92 m2
Number of rooms
1
Balcony area
8.33 m2
Bathroom area
3.96 m2
Corridor area
5.55 m2
Kitchen area
13.17 m2
Room area
10.35 m2
Storeroom area
2.56 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 4/ 4 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-004-04/0016
Building
4
Floor
4
Area
43.92 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Monolithic works, UM-2 building
Monolithic works, UM-2 building
14.10.2024
Another stage of the UM-2 construction has been completed! Reinforcement and concreting of vertical structures on the 10th floor has been...

Another stage of the UM-2 construction has been completed! Reinforcement and concreting of vertical structures on the 10th floor has been completed

There is still a lot of work ahead, but the pace is not slowing down, and every day brings us closer to the implementation of the project. Accuracy and quality remain our unchanging priorities at every stage of construction

Masonry work, building UM-2.
Masonry work, building UM-2.
24.09.2024
We continue to make intensive progress on our construction site URBAN MARKET-2 The last warm weeks of autumn and good weather contribute to...

We continue to make intensive progress on our construction site URBAN MARKET-2

The last warm weeks of autumn and good weather contribute to comfortable conditions and acceleration of work, so our specialists have already moved to the 8th floor, where they are erecting facade walls from aerated concrete blocks.

Stages of construction

Commissioning date I qtr. 2026
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, building UM-2.

24.09.2024

Similar flats in Urban Market

Price 46 502$ ₴1 962 390
Commissioning date II qtr. 2025
Area 41.5 m2
Price 47 117$ ₴1 988 340
Commissioning date II qtr. 2025
Area 36.26 m2
Price 48 324$ ₴2 039 280
Commissioning date II qtr. 2025
Area 37.46 m2
Price 48 324$ ₴2 039 280
Commissioning date II qtr. 2025
Area 37.46 m2

Similar flats in other projects

Price 45 000$ ₴1 899 010
Commissioning date IV qtr. 2021
Area 40.19 m2
Price 45 828$ ₴1 933 950
Commissioning date I qtr. 2026
Area 38.92 m2
Price 47 000$ ₴1 983 410
Commissioning date IV qtr. 2021
Area 44.38 m2
Price 47 000$ ₴1 983 410
Commissioning date IV qtr. 2021
Area 44.38 m2