Assigment
Period | First installment, $ | Monthly payment, $/m | |
---|---|---|---|
Super light with decoration Basic-full | to 60 mos. | from 4 160$₴175 560 | from 1 080$₴45 580/mos. |
Interest-free with decoration Basic-full | to 48 mos. | from 16 160$₴681 960 | from 837$₴35 330/mos. |
Super light with decoration Basic-light | to 60 mos. | from 4 160$₴175 560 | from 1 054$₴44 480/mos. |
Interest-free with decoration Basic-light | to 48 mos. | from 16 160$₴681 960 | from 528$₴22 290/mos. |
Super light without decoration | to 60 mos. | from 4 160$₴175 560 | from 820$₴34 610/mos. |
Interest-free without decoration | to 48 mos. | from 16 160$₴681 960 | from 572$₴24 140/mos. |
Квартира UM-004-04/0016 находится на 4 этаже в доме №4 жилого городка Urban Market.
У вас будет достаточно просторная кухня, площадью 13.17 м2. Здесь комфортно обедать всей семьей.
В санузле, площадью 3.96 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.
Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 5.55 м2.
В кладовку, площадью 2.56 м2, проведено освещение. Здесь удобно хранить сезонные вещи и продукты.
Балкон, площадью 8.33 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день наслаждаться легкой прохладой даже в жаркий день.
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.
The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks
The transformation of UM-3 continues!
The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!
So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!
Another stage of the UM-2 construction has been completed! Reinforcement and concreting of vertical structures on the 10th floor has been completed
There is still a lot of work ahead, but the pace is not slowing down, and every day brings us closer to the implementation of the project. Accuracy and quality remain our unchanging priorities at every stage of construction
We continue to make intensive progress on our construction site URBAN MARKET-2
The last warm weeks of autumn and good weather contribute to comfortable conditions and acceleration of work, so our specialists have already moved to the 8th floor, where they are erecting facade walls from aerated concrete blocks.