logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 39.4m2, UM-004-04/0015.
  • Planning 1-rm flats area 39.4m2, UM-004-04/0015.
  • Planning 1-rm flats area 39.4m2, UM-004-04/0015.
  • Planning 1-rm flats area 39.4m2, UM-004-04/0015.

1-комнатная квартира с европланировкой, 44.65м2

Urban Market, building 4, floor 4 ID: UM-004-04/0015
56 303$ ₴2 373 180

Without decoration

one-room european layout (bedroom + kitchen-living room) Ванная Балкон
64 183$
₴2 705 320
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-004-04/0015
Building
4
Floor
4
Number of rooms
1
Area
45.55 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 6 675$₴281 360 from 1 198$₴50 500/mos.
Interest-free with decoration Basic-full to 48 mos. from 25 930$₴1 092 950 from 797$₴33 600/mos.
Super light with decoration Basic-light to 60 mos. from 6 675$₴281 360 from 1 171$₴49 360/mos.
Interest-free with decoration Basic-light to 48 mos. from 25 930$₴1 092 950 from 477$₴20 110/mos.
Super light without decoration to 60 mos. from 6 675$₴281 360 from 929$₴39 160/mos.
Interest-free without decoration to 48 mos. from 25 930$₴1 092 950 from 522$₴22 010/mos.

About the flat

UM-004-04/0015 — это квартира в жилом городке Urban Market, расположенная на 4 этаже в доме №4.

В кухне-студии, площадью 16.95 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

Площадь санузла — 3.76 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 3.85 м2.

Балкон, площадью 8.78 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день [преимущество стороны света].

Specification

Flat ID
UM-004-04/0015
Building
4
Floor
4
Area
45.55 m2
Number of rooms
1
Balcony area
8.78 m2
Bathroom area
3.76 m2
Corridor area
3.85 m2
Kitchen area
16.95 m2
Room area
12.21 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 4/ 4 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-004-04/0015
Building
4
Floor
4
Area
45.55 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2026
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 55 124$ ₴2 323 480
Commissioning date I qtr. 2026
Area 43.01 m2
Price 56 246$ ₴2 370 770
Commissioning date I qtr. 2026
Area 49.89 m2
Price 56 517$ ₴2 382 200
Commissioning date I qtr. 2026
Area 49.91 m2
Price 57 889$ ₴2 440 030
Commissioning date I qtr. 2026
Area 45.3 m2

Similar flats in other projects

Price 52 761$ ₴2 223 880
Commissioning date I qtr. 2026
Area 44.51 m2
Price 52 800$ ₴2 225 520
Commissioning date IV qtr. 2026
Area 27.36 m2
Price 53 038$ ₴2 235 560
Commissioning date I qtr. 2026
Area 44.53 m2
Price 55 000$ ₴2 318 250
Commissioning date II qtr. 2021
Area 46.73 m2