  • Planning 1-rm flats area 39.53m2, UM-003-06/0060.
  • Planning 1-rm flats area 39.53m2, UM-003-06/0060.

One-bedroom apartment

Urban Market, building 3, floor 7 ID: UM-003-06/0060
60 727$ ₴2 541 430

Sale

one-room apartment Ванная Терраса
43 700$
₴1 828 850
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-003-06/0060
Building
3
Floor
7
Number of rooms
1
Area
46.06 m2
Area (paid)
40.62 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 4 545$₴190 210 from 1 163$₴48 680/mos.
Interest-free with decoration Basic-full to 48 mos. from 17 655$₴738 870 from 898$₴37 590/mos.
Super light with decoration Basic-light to 60 mos. from 4 545$₴190 210 from 1 135$₴47 500/mos.
Interest-free with decoration Basic-light to 48 mos. from 17 655$₴738 870 from 568$₴23 780/mos.
Super light without decoration to 60 mos. from 4 545$₴190 210 from 886$₴37 080/mos.
Interest-free without decoration to 48 mos. from 17 655$₴738 870 from 614$₴25 700/mos.

About the flat

Квартира UM-003-06/0060 находится на 6 этаже в доме №3 жилого городка Urban Market.

Удобная кухня, площадью 13.83 м2 подойдет для семейных ужинов и приема гостей.

Площадь санузла — 3.36 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Комнаты объединяет коридор, площадью 4.24 м2.

Терраса 9.32 м2 может превратиться в комфортную лаунж-зоны с креслами-мешками и уличной мебелью. Вы каждый день будете наслаждаться Солнцем, заходящим за горизонт живописной украинской степи, потому что она выходит на запад сторону.

Specification

Flat ID
UM-003-06/0060
Building
3
Floor
7
Area
46.06 m2
Area (paid)
40.62 m2
Number of rooms
1
Bathroom area
3.36 m2
Corridor area
4.24 m2
Kitchen area
13.83 m2
Room area
15.31 m2
Terrace area
9.32 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 3/ 7 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-003-06/0060
Building
3
Floor
7
Area
46.06 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date II qtr. 2025
Building 3
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 48 762$ ₴2 040 690
Commissioning date II qtr. 2025
Area 36.5 m2
Price 53 800$ ₴2 251 530
Commissioning date II qtr. 2025
Area 49.09 m2
Price 56 246$ ₴2 353 900
Commissioning date I qtr. 2026
Area 39.36 m2
Price 56 517$ ₴2 365 240
Commissioning date I qtr. 2026
Area 39.55 m2

Similar flats in other projects

Price 52 761$ ₴2 208 050
Commissioning date I qtr. 2026
Area 39.97 m2
Price 52 800$ ₴2 209 680
Commissioning date IV qtr. 2026
Area 33.43 m2
Price 53 038$ ₴2 219 650
Commissioning date I qtr. 2026
Area 40.18 m2
Price 55 000$ ₴2 301 750
Commissioning date II qtr. 2021
Area 46 m2