logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 35.47m2, UM-003-06/0058.
  • Planning 1-rm flats area 35.47m2, UM-003-06/0058.

1 комнатная квартира с европланировкой, 41.5м2

Urban Market, building 3, floor 7 ID: UM-003-06/0058
30 000$ ₴1 279 500

Assigment

one-room european layout (bedroom + kitchen-living room) Ванная Терраса
30 000$
₴1 279 500
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-003-06/0058
Building
3
Floor
7
Number of rooms
1
Area
41.50 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 3 120$₴133 070 from 1 042$₴44 450/mos.
Interest-free with decoration Basic-full to 48 mos. from 12 120$₴516 920 from 865$₴36 900/mos.
Super light with decoration Basic-light to 60 mos. from 3 120$₴133 070 from 1 018$₴43 420/mos.
Interest-free with decoration Basic-light to 48 mos. from 12 120$₴516 920 from 576$₴24 570/mos.
Super light without decoration to 60 mos. from 3 120$₴133 070 from 799$₴34 080/mos.
Interest-free without decoration to 48 mos. from 12 120$₴516 920 from 617$₴26 320/mos.

About the flat

Квартира UM-003-06/0058 находится на 6 этаже в доме №3 жилого городка Urban Market.

У вас будет кухня-студия, площадью 18.24 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

Площадь санузла — 3.33 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Терраса 8.61 м2 может превратиться в комфортную лаунж-зоны с креслами-мешками и уличной мебелью. Вы каждый день будете наслаждаться Солнцем, заходящим за горизонт живописной украинской степи, потому что она выходит на запад сторону.

Specification

Flat ID
UM-003-06/0058
Building
3
Floor
7
Area
41.50 m2
Number of rooms
1
Bathroom area
3.33 m2
Kitchen area
18.24 m2
Room area
11.32 m2
Terrace area
8.61 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 3/ 7 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-003-06/0058
Building
3
Floor
7
Area
41.50 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date II qtr. 2025
Building 3
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 42 445$ ₴1 810 280
Commissioning date I qtr. 2026
Area 32.5 m2
Price 45 915$ ₴1 958 280
Commissioning date II qtr. 2025
Area 35.51 m2
Price 45 915$ ₴1 958 280
Commissioning date II qtr. 2025
Area 33.18 m2
Price 47 117$ ₴2 009 550
Commissioning date II qtr. 2025
Area 36.26 m2

Similar flats in other projects

Price 41 996$ ₴1 791 130
Commissioning date I qtr. 2026
Area 37.24 m2
Price 42 000$ ₴1 791 300
Commissioning date II qtr. 2026
Area 36.66 m2
Price 43 179$ ₴1 841 590
Commissioning date I qtr. 2026
Area 38.26 m2
Price 43 413$ ₴1 851 570
Commissioning date I qtr. 2026
Area 39.72 m2