Period | First installment, $ | Monthly payment, $/m | |
---|---|---|---|
Super light with decoration Basic-full | to 60 mos. | from 3 380$₴142 810 | from 936$₴39 550/mos. |
Interest-free with decoration Basic-full | to 48 mos. | from 13 131$₴554 790 | from 740$₴31 270/mos. |
Super light with decoration Basic-light | to 60 mos. | from 3 380$₴142 810 | from 914$₴38 620/mos. |
Interest-free with decoration Basic-light | to 48 mos. | from 13 131$₴554 790 | from 482$₴20 370/mos. |
Super light without decoration | to 60 mos. | from 3 380$₴142 810 | from 719$₴30 380/mos. |
Interest-free without decoration | to 48 mos. | from 13 131$₴554 790 | from 518$₴21 890/mos. |
Квартира UM-003-03/0005 находится на 3 этаже в доме №3 жилого городка Urban Market.
Удобная кухня, площадью 14.21 м2 подойдет для семейных ужинов и приема гостей.
Площадь санузла — 3.01 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.
Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 3.11 м2.
Террасу, площадью 8.23 м2, можно использовать в качестве лаунж-зоны. Она выходит на восток сторону. Поэтому отсюда вы можете каждый день наблюдать за яркими рассветами.
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.
The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks
The next stage of work on Urban Market-3 is completed
We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal
We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!
Active work continues at the Urban Market-3 construction site!
Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.
We continue to work despite all the difficulties and challenges of today to achieve our goal!
The transformation of UM-3 continues!
The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!
So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!