logo
square E-STORE
$ USD down
3D
  • Planning Parking places area m2, UM-002-00/П012.
  • Planning Parking places area m2, UM-002-00/П012.

Parking places, 1m2

Urban Market, building 2, floor -1 ID: UM-002-00/П012
16 000$ ₴665 600

Without decoration

Parking ID
UM-002-00/П012
Building
2
Floor
-1
Area
1.00 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 1 664$₴69 230 from 299$₴12 440/mos.
Interest-free with decoration Basic-full to 48 mos. from 6 464$₴268 910 from 199$₴8 280/mos.
Super light with decoration Basic-light to 60 mos. from 1 664$₴69 230 from 0$₴0/mos.
Interest-free with decoration Basic-light to 48 mos. from 6 464$₴268 910 from 0$₴0/mos.
Super light without decoration to 60 mos. from 1 664$₴69 230 from 0$₴0/mos.
Interest-free without decoration to 48 mos. from 6 464$₴268 910 from 0$₴0/mos.

About the parking place

Парковочное место UM-002-00/П012 расположено в жилом городке Urban Market.

Удобно, когда машина находится недалеко от дома. А ещё парковка круглосуточно охраняется ,поэтому вам не нужно беспокоиться за сохранность транспорта.

Specification

Parking ID
UM-002-00/П012
Building
2
Floor
-1
Area
1.00 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 2/ -1 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-002-00/П012
Building
2
Floor
-1
Area
1.00 m2

Calculator

Minimum payment $

Construction progress

Construction progress in February 2023
Construction progress in February 2023
23.02.2023
Don't stop and keep building day after day! News from the ARTVILLE construction site: House 15: We continue the repair and facade work, as...

Don't stop and keep building day after day!


News from the ARTVILLE construction site:

House 15: We continue the repair and facade work, as well as the arrangement of the territory.

House 4: We received the materials and continue the glazing.

House 6: We continue to install interior partitions

Doma 21/22: Piling continues


UM-2: The 6th floor horizontal slab and the 7th floor vertical slab were poured with concrete.

UM-3: The interior walls and interior partitions of the 3rd floor were erected.


Just like a year ago, we are working to ensure that everyone who trusts us receives the keys to their own apartment and builds their life here with us. In the town of happy people.❤️

Results 2022
Results 2022
26.12.2022
It's time to sum up our work for the year and make plans for the future. Although this year has been very difficult, it has brought us new skills...
It's time to sum up our work for the year and make plans for the future.
Although this year has been very difficult, it has brought us new skills and an understanding that strength lies in unity and support.

3 turn
House #14:
In February and the beginning of March, we completed repairs in the first apartments and started commissioning already in mid-March.
During the year, 90% of the apartments in the house were handed over.

House #15:
Completed communications, rough repairs.
We are finishing the finishing of corridors, stairs and 2 floors have already been completed.
We continue repairs on the next floors.

4 turn
House #4:
We have completed the installation of windows by 60% and continue to work with the roof.
We plan to start working with ventilation.
House #5:
In 2022, the laying of external and internal walls was completed.

House #6:
We completed the monolithic structures of the house and the laying of the outer walls. Now we are laying the interior. Work is already underway on the 3rd floor!

5 turn
House #19:
Since the beginning of the year, we have completed the construction of the pile field, work with the foundation and built two floors of monolithic structures.

House #20:
We completed the construction of the pile field, work with the foundation and built three floors of monolithic structures.

Houses #21-22:
Leader drilling of piles has begun.


Houses above Urban Market
UM-1:
We completed the crushing and testing of piles.

UM-2:
Built 4.5 and 6 floors of monolithic structures.
The laying of the outer and inner walls of the 4th floor was also completed.

UM-3:
We built 5 floors of monolithic structures from 3 to 8.
The laying of the outer walls of the 3rd floor has been completed.

UM-4:
We completed the crushing and testing of piles.

Ход строительства в октябре 2022
Ход строительства в октябре 2022
20.10.2022
Октябрьские новости по строительству уже готовы! Делимся информацией о том,...
Октябрьские новости по строительству уже готовы!

Делимся информацией о том, как строился наш городок за последний месяц:

3 очередь
Дом №14:
Готовим к сдаче 1 этаж.

Дом №15:
11 этаж: устанавливаем кондиционеры. Готовим к сдаче.
10-9 этажа: монтируем плинтуса и натяжные потолки. Завершаем ремонты.
8-7 этажа: укладываем ламинат, монтируем потолок в коридорах.
6-3 этажа: укладываем плитку.
2-1 этажа: разводим сантехнику.

4 очередь
Дом №4:
Завершили монтаж окон на 3-4 этажах и 8-12 этажах.
Готовимся к установке оконных конструкций с 5 по 7 этажа.
Начали обустройство кровли.
Готовимся к устройству вентиляции.

Дом №5:
Выполняем кладку внутренних стен на 11 этаже.
Проводим подготовку к устройству кровли.
Проводим замеры для оконных конструкций.

Дом №6:
Завершили кладку стен на 12 этаже.

5 очередь
Дом №19:
Завершили опалубку перекрытия 1 этажа.
Продолжаем армирование.

Дом №20:
Продолжаем опалубку перекрытия 2 этажа.

Дома №21-22:
Готовимся к работе с полем свай.


Дома над Urban Market
UM-1:
Завершаем испытание свай.

UM-2:
Готовимся к перекрытию шестого этажа.

UM-3:
Выполнили бетонирование вертикальных конструкций 8 этажа.
Готовимся к горизонтальному перекрытию.
Завершили кладку наружных стен на третьем этаже.

UM-4:
Продолжаем давить сваи.

Construction progress in May 2023
Construction progress in May 2023
06.09.2022
A new piece of news from the construction site of the residential town ARTVILLE. We share the results of the last month and rush to build further....
A new piece of news from the construction site of the residential town ARTVILLE.
We share the results of the last month and rush to build further. Follow the news!

Stages of construction

Commissioning date II qtr. 2025
Building 2
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Construction progress in May 2023

06.09.2022

Similar flats in Urban Market

Price 16 500$ ₴686 400
Commissioning date II qtr. 2025
Area 22.29 m2

Similar flats in other projects

Price 14 765$ ₴614 230
Commissioning date II qtr. 2026
Area 18.88 m2
Price 16 000$ ₴665 600
Commissioning date II qtr. 2026
Area 22.51 m2
Price 17 000$ ₴707 200
Commissioning date III qtr. 2025
Area 21.16 m2
Price 17 500$ ₴728 000
Commissioning date I qtr. 2026
Area 25.68 m2