logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 36.61m2, UM-002-05/0035.
  • Planning 1-rm flats area 36.61m2, UM-002-05/0035.

Одно комнатная квартира с европланировкой, 36.61м2

Urban Market, building 2, floor 6 ID: UM-002-05/0035
47 337$ ₴1 997 630

Without decoration

one-room european layout (bedroom + kitchen-living room) Ванная Терраса
54 659$
₴2 306 610
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-002-05/0035
Building
2
Floor
6
Number of rooms
1
Area
36.61 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 5 685$₴239 910 from 1 021$₴43 090/mos.
Interest-free with decoration Basic-full to 48 mos. from 22 082$₴931 870 from 679$₴28 660/mos.
Super light with decoration Basic-light to 60 mos. from 5 685$₴239 910 from 996$₴42 040/mos.
Interest-free with decoration Basic-light to 48 mos. from 22 082$₴931 870 from 382$₴16 130/mos.
Super light without decoration to 60 mos. from 5 685$₴239 910 from 770$₴32 500/mos.
Interest-free without decoration to 48 mos. from 22 082$₴931 870 from 424$₴17 900/mos.

About the flat

Квартира UM-002-05/0035 находится на 5 этаже в доме №2 жилого городка Urban Market.

В кухне-студии, площадью 22.59 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

В санузле, площадью 3.17 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Терраса, площадью 1.02 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день наблюдать за Солнцем, заходящим за горизонт живописной украинской степи.

Specification

Flat ID
UM-002-05/0035
Building
2
Floor
6
Area
36.61 m2
Number of rooms
1
Bathroom area
3.17 m2
Kitchen area
22.59 m2
Room area
9.83 m2
Terrace area
1.02 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 2/ 6 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-002-05/0035
Building
2
Floor
6
Area
36.61 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date II qtr. 2025
Building 2
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 45 915$ ₴1 937 620
Commissioning date II qtr. 2025
Area 35.51 m2
Price 45 915$ ₴1 937 620
Commissioning date II qtr. 2025
Area 33.18 m2
Price 47 117$ ₴1 988 340
Commissioning date II qtr. 2025
Area 36.26 m2
Price 47 117$ ₴1 988 340
Commissioning date II qtr. 2025
Area 36.44 m2

Similar flats in other projects

Price 43 000$ ₴1 814 610
Commissioning date IV qtr. 2021
Area 37.63 m2
Price 43 179$ ₴1 822 160
Commissioning date I qtr. 2026
Area 38.26 m2
Price 43 413$ ₴1 832 030
Commissioning date I qtr. 2026
Area 39.72 m2
Price 47 000$ ₴1 983 410
Commissioning date IV qtr. 2021
Area 44.38 m2