logo
square E-STORE
$ USD down
3D
  • Planning Smart flats area 21.98m2, UM-002-03/0013.
  • Planning Smart flats area 21.98m2, UM-002-03/0013.

Smart-студия, 21.98м2

Urban Market, building 2, floor 4 ID: UM-002-03/0013
24 000$ ₴1 024 810

Assigment

smart apartment Ванная Терраса
24 000$
₴1 024 810
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-002-03/0013
Building
2
Floor
4
Area
21.98 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 2 496$₴106 580 from 640$₴27 330/mos.
Interest-free with decoration Basic-full to 48 mos. from 9 696$₴414 020 from 494$₴21 100/mos.
Super light with decoration Basic-light to 60 mos. from 2 496$₴106 580 from 625$₴26 690/mos.
Interest-free with decoration Basic-light to 48 mos. from 9 696$₴414 020 from 315$₴13 460/mos.
Super light without decoration to 60 mos. from 2 496$₴106 580 from 490$₴20 930/mos.
Interest-free without decoration to 48 mos. from 9 696$₴414 020 from 341$₴14 570/mos.

About the flat

Квартира UM-002-03/0013 находится на 3 этаже в доме №2 жилого городка Urban Market.

Любуйтесь ежедневно на двор со своей SMART-студии. Расположение на северной стороне дает ей дополнительное преимущество: вы можете каждый день наслаждаться легкой прохладой даже в жаркий день.

SMART-студия, площадью21.98 м2 — это удобная квартира, которая требует минимум ухода и расходов. Она отлично подходит для начала самостоятельной жизни.

В кухне-студии, площадью 16.77 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

В санузле, площадью 2.89 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Террасу, площадью 2.32 м2, можно использовать в качестве лаунж-зоны. Она выходит на север сторону. Поэтому отсюда вы можете каждый день наслаждаться легкой прохладой даже в жаркий день.

Specification

Flat ID
UM-002-03/0013
Building
2
Floor
4
Area
21.98 m2
Bathroom area
2.89 m2
Kitchen area
16.77 m2
Terrace area
2.32 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 2/ 4 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-002-03/0013
Building
2
Floor
4
Area
21.98 m2

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date II qtr. 2025
Building 2
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 26 200$ ₴1 118 740
Commissioning date III qtr. 2026
Area 29.8 m2
Price 28 992$ ₴1 237 960
Commissioning date II qtr. 2025
Area 21.98 m2
Price 29 545$ ₴1 261 580
Commissioning date III qtr. 2026
Area 30.05 m2
Price 30 531$ ₴1 303 680
Commissioning date I qtr. 2026
Area 25.85 m2

Similar flats in other projects

Price 27 000$ ₴1 152 900
Commissioning date IV qtr. 2021
Area 26.79 m2
Price 28 000$ ₴1 195 600
Commissioning date IV qtr. 2021
Area 31.99 m2
Price 28 649$ ₴1 223 320
Commissioning date I qtr. 2026
Area 28.44 m2
Price 30 000$ ₴1 281 000
Commissioning date III qtr. 2022
Area 29.52 m2