Assigment
Period | First installment, $ | Monthly payment, $/m | |
---|---|---|---|
Super light with decoration Basic-full | to 60 mos. | from 2 641$₴111 460 | from 861$₴36 340/mos. |
Interest-free with decoration Basic-full | to 48 mos. | from 10 261$₴433 020 | from 710$₴29 970/mos. |
Super light with decoration Basic-light | to 60 mos. | from 2 641$₴111 460 | from 841$₴35 500/mos. |
Interest-free with decoration Basic-light | to 48 mos. | from 10 261$₴433 020 | from 473$₴19 970/mos. |
Super light without decoration | to 60 mos. | from 2 641$₴111 460 | from 661$₴27 900/mos. |
Interest-free without decoration | to 48 mos. | from 10 261$₴433 020 | from 507$₴21 400/mos. |
UM-001-07/0023 — это квартира в жилом городке Urban Market, расположенная на 7 этаже в доме №1.
У вас будет кухня-студия, площадью 15.27 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.
Площадь санузла — 3.37 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.
Балкон, площадью 7.31 м2, можно обустроить в качестве лаунж-зоны. Он выходит на восток сторону. Поэтому отсюда вы можете каждый день наблюдать за тихими и живописными рассветами.
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.
The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks
The transformation of UM-3 continues!
The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!
So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!
Another stage of the UM-2 construction has been completed! Reinforcement and concreting of vertical structures on the 10th floor has been completed
There is still a lot of work ahead, but the pace is not slowing down, and every day brings us closer to the implementation of the project. Accuracy and quality remain our unchanging priorities at every stage of construction
We continue to make intensive progress on our construction site URBAN MARKET-2
The last warm weeks of autumn and good weather contribute to comfortable conditions and acceleration of work, so our specialists have already moved to the 8th floor, where they are erecting facade walls from aerated concrete blocks.