logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 32.74m2, UM-001-06/0022.
  • Planning 1-rm flats area 32.74m2, UM-001-06/0022.

1 комнатная квартира, 38.65м2

Urban Market, building 1, floor 6 ID: UM-001-06/0022
one-room apartment Ванная Балкон
Flat ID
UM-001-06/0022
Building
1
Floor
6
Number of rooms
1
Area
38.65 m2

About the flat

Квартира UM-001-06/0022 находится на 6 этаже в доме №1 жилого городка Urban Market.

У вас будет достаточно просторная кухня, площадью 13.92 м2. Здесь комфортно обедать всей семьей.

Площадь санузла — 3.37 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Комнаты объединяет коридор, площадью 3.30 м2.

Балкон, площадью 8.44 м2, можно обустроить в качестве лаунж-зоны. Он выходит на восток сторону. Поэтому отсюда вы можете каждый день наслаждаться яркими рассветами.

Specification

Flat ID
UM-001-06/0022
Building
1
Floor
6
Area
38.65 m2
Number of rooms
1
Balcony area
8.44 m2
Bathroom area
3.37 m2
Corridor area
3.30 m2
Kitchen area
13.92 m2
Room area
9.62 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 1/ 6 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-001-06/0022
Building
1
Floor
6
Area
38.65 m2
Number of rooms
1

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Monolithic works, UM-2 building
Monolithic works, UM-2 building
14.10.2024
Another stage of the UM-2 construction has been completed! Reinforcement and concreting of vertical structures on the 10th floor has been...

Another stage of the UM-2 construction has been completed! Reinforcement and concreting of vertical structures on the 10th floor has been completed

There is still a lot of work ahead, but the pace is not slowing down, and every day brings us closer to the implementation of the project. Accuracy and quality remain our unchanging priorities at every stage of construction

Masonry work, building UM-2.
Masonry work, building UM-2.
24.09.2024
We continue to make intensive progress on our construction site URBAN MARKET-2 The last warm weeks of autumn and good weather contribute to...

We continue to make intensive progress on our construction site URBAN MARKET-2

The last warm weeks of autumn and good weather contribute to comfortable conditions and acceleration of work, so our specialists have already moved to the 8th floor, where they are erecting facade walls from aerated concrete blocks.

Stages of construction

Commissioning date I qtr. 2026
Building 1
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, building UM-2.

24.09.2024

Similar flats in Urban Market

Price 40 000$ ₴1 688 000
Commissioning date II qtr. 2025
Area 26.62 m2
Price 40 000$ ₴1 688 000
Commissioning date I qtr. 2026
Area 41.16 m2
Price 40 500$ ₴1 709 100
Commissioning date II qtr. 2025
Area 34.39 m2
Price 42 445$ ₴1 791 180
Commissioning date I qtr. 2026
Area 32.5 m2

Similar flats in other projects

Price 39 400$ ₴1 662 680
Commissioning date II qtr. 2026
Area 30.48 m2
Price 40 000$ ₴1 688 000
Commissioning date II qtr. 2026
Area 32.79 m2
Price 41 996$ ₴1 772 240
Commissioning date I qtr. 2026
Area 37.24 m2
Price 42 000$ ₴1 772 410
Commissioning date II qtr. 2026
Area 36.66 m2