logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 46.89m2, UM-001-04/0008.
  • Planning 1-rm flats area 46.89m2, UM-001-04/0008.
  • Planning 1-rm flats area 46.89m2, UM-001-04/0008.
  • Planning 1-rm flats area 46.89m2, UM-001-04/0008.

Двух комнатная квартира с европланировкой, 52.58м2

Urban Market, building 1, floor 4 ID: UM-001-04/0008
66 979$ ₴2 809 770

Without decoration

one-room european layout (bedroom + kitchen-living room) Ванная Балкон
76 327$
₴3 201 920
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
UM-001-04/0008
Building
1
Floor
4
Number of rooms
1
Area
54.34 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 7 938$₴333 000 from 1 425$₴59 780/mos.
Interest-free with decoration Basic-full to 48 mos. from 30 836$₴1 293 580 from 948$₴39 770/mos.
Super light with decoration Basic-light to 60 mos. from 7 938$₴333 000 from 1 393$₴58 440/mos.
Interest-free with decoration Basic-light to 48 mos. from 30 836$₴1 293 580 from 568$₴23 830/mos.
Super light without decoration to 60 mos. from 7 938$₴333 000 from 1 106$₴46 400/mos.
Interest-free without decoration to 48 mos. from 30 836$₴1 293 580 from 622$₴26 100/mos.

About the flat

UM-001-04/0008 — это квартира в жилом городке Urban Market, расположенная на 4 этаже в доме №1.

У вас будет кухня-студия, площадью 28.16 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

В санузле, площадью 3.88 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Балкон 10.65 м2 может превратиться в комфортную лаунж-зону с креслами-мешками. Вы каждый день будете [преимущество стороны света], потому что он выходит на юго-восток сторону.

Specification

Flat ID
UM-001-04/0008
Building
1
Floor
4
Area
54.34 m2
Number of rooms
1
Balcony area
10.65 m2
Bathroom area
3.88 m2
Kitchen area
28.16 m2
Room area
11.65 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Urban Market/ Building 1/ 4 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
UM-001-04/0008
Building
1
Floor
4
Area
54.34 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

Masonry work, building UM-2.
Masonry work, building UM-2.
17.12.2024
The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace. The next stage is...

The construction of facade walls from aerated concrete blocks on the 9th floor has begun. The work is progressing at a rapid pace.

The next stage is the construction of inter-apartment walls. So we are currently awaiting the delivery of expanded clay blocks

Monolithic works, UM-3 building
Monolithic works, UM-3 building
10.12.2024
The next stage of work on Urban Market-3 is completed We have carried out concreting of vertical structures on the 12th floor. So we are one step...

The next stage of work on Urban Market-3 is completed

We have carried out concreting of vertical structures on the 12th floor. So we are one step closer to our goal

We always report on the progress of the work in stories and publications. Stay with us so as not to miss them - there are many interesting things ahead!

Masonry work, UM-3 building
Masonry work, UM-3 building
02.12.2024
Active work continues at the Urban Market-3 construction site! Our specialists have started the construction of inter-apartment walls on the 10th...

Active work continues at the Urban Market-3 construction site!

Our specialists have started the construction of inter-apartment walls on the 10th floor! We use expanded clay blocks. After all, this material is light and durable, and also has good heat and sound insulation properties.

We continue to work despite all the difficulties and challenges of today to achieve our goal!

Masonry work, UM-3 building
Masonry work, UM-3 building
19.11.2024
The transformation of UM-3 continues! The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking...

The transformation of UM-3 continues!

The laying of facade walls from aerated concrete blocks on the 10th floor has now begun! This is painstaking work that requires compliance with certain rules and technologies to ensure the strength of the structures. And our specialists perform it perfectly!

So continue to follow our updates on social networks to watch together as we approach the final goal floor by floor!

Stages of construction

Commissioning date I qtr. 2026
Building 1
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Masonry work, UM-3 building

19.11.2024

Similar flats in Urban Market

Price 62 595$ ₴2 625 870
Commissioning date III qtr. 2026
Area 48.15 m2
Price 62 983$ ₴2 642 140
Commissioning date II qtr. 2025
Area 49.09 m2
Price 67 119$ ₴2 815 650
Commissioning date I qtr. 2026
Area 54.34 m2
Price 67 220$ ₴2 819 880
Commissioning date I qtr. 2026
Area 54.47 m2

Similar flats in other projects

Price 62 133$ ₴2 606 480
Commissioning date I qtr. 2026
Area 50.4 m2
Price 62 700$ ₴2 630 270
Commissioning date I qtr. 2026
Area 58.21 m2
Price 69 968$ ₴2 935 160
Commissioning date I qtr. 2026
Area 59.64 m2
Price 69 968$ ₴2 935 160
Commissioning date I qtr. 2026
Area 59.64 m2