logo
$ USD down
3D
  • Planning 2-rm flats area 77.88m2, LR-004-02/0007.
  • Planning 2-rm flats area 77.88m2, LR-004-02/0007.

Двукомнатная квартира, 77.88m2

Lizrome, building 4, floor 2 ID: LR-004-02/0007
100 076$ ₴4 153 160

Without decoration

two-room european layout (2 bedrooms + kitchen-living room) Ванная Балкон Field
127 334$
₴5 284 370
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
LR-004-02/0007
Building
4
Floor
2
Number of rooms
2
Area
87.70 m2
Area (paid)
77.88 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Basic-full to 24 mos. from 38 710$₴1 606 470 from 3 693$₴153 260/mos.
Interest-free without decoration to 24 mos. from 38 710$₴1 606 470 from 0$₴0/mos.

About the flat

Specification

Flat ID
LR-004-02/0007
Building
4
Floor
2
Area
87.70 m2
Area (paid)
77.88 m2
Number of rooms
2
Balcony area
6.98 m2
Bathroom area
4.68 m2
Corridor area
8.65 m2
Kitchen area
22.10 m2
Loggia area
9.87 m2
Room area
17.05 m2
Room 2 area
14.39 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Lizrome/ Building 4/ 2 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
LR-004-02/0007
Building
4
Floor
2
Area
87.70 m2
Number of rooms
2

Calculator

Minimum payment $

Construction progress

Lizrome construction progress: basement reinforcement has started
Lizrome construction progress: basement reinforcement has started
30.07.2025
Lizrome construction progress: the concreting of the foundation slab has been completed, and basement reinforcement has begun. The Lizrome project...

Lizrome construction progress: the concreting of the foundation slab has been completed, and basement reinforcement has begun.

The Lizrome project team continues to actively move on schedule — one of the most important stages of construction has now been completed, and the next one has begun.

Foundation Slab Concreting Completed

The concreting of the foundation slab was recently fully completed. The work was performed in accordance with the technical design, with strict adherence to building codes.

  • Base preparation and installation of the rebar cage have been carried out.
  • Concreting was performed using a high-quality concrete mix.
  • Proper conditions were ensured for the concrete slab to gain strength.

After this process is complete, the slab will withstand the vertical loads from the entire building and will guarantee the structure's longevity.


Basement Vertical Element Reinforcement Has Begun

In parallel, the next stage has already started: the reinforcement of the vertical elements of the basement level. This involves installing rebar cages for the basement walls and columns, which will later be filled with concrete.

These elements form the framework of the lower part of the building, which will include:

  • technical rooms,
  • as well as space for a future parking lot.

The reinforcement is performed according to the project, taking into account all calculations for loads and waterproofing. Such precision not only guarantees the reliability of the structures but also ensures the effective use of the space in the future.



Each stage elevates Lizrome to a new level. We are grateful to everyone who is following our progress, and we will soon present the next updates.

Lizrome is more than square meters. It is a community being created with modern standards of quality, comfort, and sustainable development in mind.

Lizrome - Concrete preparation for the foundation slab: the first step towards a reliable home
Lizrome - Concrete preparation for the foundation slab: the first step towards a reliable home
16.07.2025
The reliability of any building begins with its foundation — the foundation slab. And its quality installation is impossible without proper...

The reliability of any building begins with its foundation — the foundation slab. And its quality installation is impossible without proper concrete preparation.

What we are performing:

  • Concrete preparation for the foundation slab. This stage provides a level, stable base for subsequent work. We use dense concrete of the appropriate grade, which prevents the structure from settling and ensures the building's longevity.
  • Forming rebar blanks. In the next stage, we form rebar elements for future reinforcement. This allows us to create an integral and rigid structure that can withstand loads.
  • Starting the reinforcement of the foundation slab. We use proven materials and adhere to technical standards to ensure maximum slab strength. Reinforcement is the “skeleton” of the foundation, bearing the main load from the building.


Every stage is performed with millimeter precision. We care not only about quality but also about the technological sequence of work.

What's new at the Lizrome construction site?
What's new at the Lizrome construction site?
12.06.2025
What's new at the Lizrome construction site? At the Lizrome residential complex construction site, important steps towards creating a comfortable and...

What's new at the Lizrome construction site? At the Lizrome residential complex construction site, important steps towards creating a comfortable and modern living space are happening daily. This week, the team completed a key stage: the installation of the foundation slab for the tower crane.

What has already been done?

  • Base preparation — thorough leveling and compaction of the soil have been carried out to ensure the stability of the structure.
  • Reinforcement — the rebar cage has been assembled in accordance with all project documentation requirements. This is crucial for the reliability and durability of the concrete base.
  • Concreting — the work has been completed precisely according to technical standards: certified concrete was used, and temperature and curing times were observed.

Next stage

Once the concrete slab reaches the required strength, the construction team will continue work on the site — the installation of the tower crane will allow us to proceed to the active phase of constructing the structures.



Step by step, we are creating a space for life, tranquility, and well-being. Follow Lizrome news — there's much more to come!

Lizrome Construction: The installation of the sheet pile wall is nearing completion
Lizrome Construction: The installation of the sheet pile wall is nearing completion
14.04.2025
The Lizrome team adheres to high standards of quality and precision at every stage. Today, we are pleased to announce that the sheet pile wall works...

The Lizrome team adheres to high standards of quality and precision at every stage. Today, we are pleased to announce that the sheet pile wall works are entering the final straight!

What has been done?

Over the past few weeks, specialists have completed a complex and technically important set of works, which included:

  • The installation of bored injection sheet piles to create a temporary but reliable excavation enclosure.
  • The concreting of the tie beam, which connects the sheet piles into a single structure and acts as additional reinforcement for the entire system.

Why is this necessary?

A sheet pile wall is not just an engineering necessity. This solution:

  • prevents soil collapse in a deep pit;
  • allows for safe excavation work even near existing infrastructure;
  • ensures long-term stability of the construction site;
  • allows the excavation geometry to be maintained for precise installation of the foundation slabs.

Stages of construction

Commissioning date III qtr. 2026
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Lizrome Construction: The installation of the sheet pile wall is nearing completion

14.04.2025

Similar flats in Lizrome

Price 91 661$ ₴3 808 520
Commissioning date II qtr. 2026
Area 69.97 m2
Price 100 083$ ₴4 158 450
Commissioning date II qtr. 2026
Area 76.81 m2
Price 107 341$ ₴4 460 020
Commissioning date II qtr. 2026
Area 82.38 m2
Price 108 223$ ₴4 496 670
Commissioning date II qtr. 2026
Area 83.57 m2