3D
  • Planning 1-rm flats area 20.88m2, KS-01B-05/0011.
  • Planning 1-rm flats area 20.88m2, KS-01B-05/0011.

1-комнатная квартира с европланировкой, 20.88м2

Keks, building 2, floor 5 ID: KS-01B-05/0011
one-room european layout (bedroom + kitchen-living room) Ванная
Flat ID
KS-01B-05/0011
Building
2
Floor
5
Number of rooms
1
Area
20.88 m2

About the flat

Хотите жить в уютном городке со всей необходимой инфраструктурой? Тогда переезжайте в квартиру KS-01B-05/0011 в жилом городке Keks. Она расположена на этаже этаже в доме №2.

При покупке квартиры в комплектации full, в вашей кухне-студии, площадью 11.02 м2, будет сразу установлена кухонная мебель, вытяжка, духовка, варочная поверхность и вся сантехника.

В санузле, площадью 3.03 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Specification

Flat ID
KS-01B-05/0011
Building
2
Floor
5
Area
20.88 m2
Number of rooms
1
Bathroom area
3.03 m2
Kitchen area
11.02 m2
Room area
6.83 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Keks/ Building 2/ 5 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
KS-01B-05/0011
Building
2
Floor
5
Area
20.88 m2
Number of rooms
1

Construction progress

Keks construction progress. Quarterly report
Keks construction progress. Quarterly report
24.01.2024
Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings -...

Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings - the concrete has arrived, the grillwork has been poured, and the windows have already arrived, the windows have been accepted (and the quality must be checked!), and here is a new batch of bricks. And so almost every day. But we don't complain, on the contrary, we brag! Because KEKS is under construction. To the anger of the enemies and to the joy of my mother.

Watch the video report from the KEKS construction site: we show how many materials arrive, how we build and which apartments we rent to investors. Also, follow the news on the website and in social networks - we regularly publish reports on the progress of construction and the life of the town. A lot of interesting things await you this year.

Stages of construction

Commissioning date II qtr. 2023
Building 2
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Supply of building materials

10.01.2024