logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 36.36m2, KS-01B-02/0013.
  • Planning 1-rm flats area 36.36m2, KS-01B-02/0013.

1-комнатная квартира, 36.36м2

Keks, building 2, floor 2 ID: KS-01B-02/0013
28 000$ ₴1 181 600

Assigment

one-room apartment Ванная
28 000$
₴1 181 600
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
KS-01B-02/0013
Building
2
Floor
2
Number of rooms
1
Area
36.36 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Basic-full to 48 mos. from 11 312$₴477 370 from 285$₴12 030/mos.
Super light with decoration Basic-full to 60 mos. from 2 912$₴122 890 from 634$₴26 760/mos.
Super light without decoration to 60 mos. from 2 912$₴122 890 from 298$₴12 580/mos.
Interest-free without decoration to 48 mos. from 11 312$₴477 370 from 295$₴12 450/mos.

About the flat

KS-01B-02/0013 — это квартира в жилом городке Keks, расположенная на 2 этаже в доме №2.

Удобная кухня, площадью 14.67 м2 подойдет для семейных ужинов и приема гостей.

В санузле, площадью 3.49 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Комнаты объединяет коридор, площадью 5.30 м2.

Specification

Flat ID
KS-01B-02/0013
Building
2
Floor
2
Area
36.36 m2
Number of rooms
1
Bathroom area
3.49 m2
Corridor area
5.30 m2
Kitchen area
14.67 m2
Room area
12.90 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Keks/ Building 2/ 2 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
KS-01B-02/0013
Building
2
Floor
2
Area
36.36 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

How we build KEKS: early September
How we build KEKS: early September
20.09.2024
We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the...

We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the construction site into a real town of the future.

Every brick, every floor slab, every meter of laid communications is the result of the painstaking work of our builders, who put their soul and professionalism into their work. We use only the highest quality materials from proven suppliers to ensure the reliability and durability of each house.

We recently received a large batch of bricks, which allowed us to accelerate the pace of construction of load-bearing walls. In parallel, the construction of external walls has already been completed, which gives the complexes a finished look. The installation of floor slabs is in full swing, creating a solid frame for future apartments.

We pay special attention to engineering systems. The delivery of plumbing has already been completed, and we are preparing for its installation. This ensures that each apartment will be equipped with modern communications that provide comfort and convenience of living. We understand how important comfort and safety are for each client. Therefore, in addition to high quality construction, we also take care of creating a pleasant microclimate in each apartment. The modern energy-saving technologies that we use will reduce heating and air conditioning costs, as well as preserve the environment. We are confident that the KEKS residential complex will become a real pearl and will give its residents coziness, comfort and joy of living in a modern and safe home. Follow our updates so as not to miss important events and become one of the first owners of an apartment in the KEKS residential complex.

Unbreakable delivery of house B
Unbreakable delivery of house B
24.02.2024
The KEKS town continues to fill with life and character! Now, building B!!! The first keys to the second house of the first stage have been received,...

The KEKS town continues to fill with life and character! Now, building B!!! The first keys to the second house of the first stage have been received, and we are happy to congratulate investors on a new stage in their lives! ;)

In addition to character, KEKS is also filled with its own zest! Therefore, now, in addition to a nice signboard, which is a light in its heart, it has a real proof of courage - a steel plate, which testifies to the strength of the town and its unbreakable surrender during a full-scale war!✊

This event was so important for all of us that the CEO and founder of the holding, Boris Goldenshtein, came to its official and delicious celebration, along with honored guests from the ranks of the Armed Forces of Ukraine and the head of the Avangardivka territorial community, Serhiy Khrustovsky.

We defeat evil, we gain victory and we build a real town with the character of each of us!

Keks construction progress. Quarterly report
Keks construction progress. Quarterly report
24.01.2024
Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings -...

Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings - the concrete has arrived, the grillwork has been poured, and the windows have already arrived, the windows have been accepted (and the quality must be checked!), and here is a new batch of bricks. And so almost every day. But we don't complain, on the contrary, we brag! Because KEKS is under construction. To the anger of the enemies and to the joy of my mother.

Watch the video report from the KEKS construction site: we show how many materials arrive, how we build and which apartments we rent to investors. Also, follow the news on the website and in social networks - we regularly publish reports on the progress of construction and the life of the town. A lot of interesting things await you this year.

Stages of construction

Commissioning date II qtr. 2023
Building 2
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Keks construction progress. Quarterly report

24.01.2024

Similar flats in Keks

Price 30 500$ ₴1 287 100
Commissioning date IV qtr. 2025
Area 29.78 m2
Price 31 000$ ₴1 308 200
Commissioning date III qtr. 2025
Area 29.85 m2
Price 31 000$ ₴1 308 200
Commissioning date II qtr. 2023
Area 34.2 m2
Price 36 100$ ₴1 523 420
Commissioning date III qtr. 2025
Area 31.04 m2

Similar flats in other projects

Price 31 105$ ₴1 312 640
Commissioning date II qtr. 2025
Area 29.18 m2
Price 32 000$ ₴1 350 400
Commissioning date II qtr. 2025
Area 34.39 m2
Price 35 000$ ₴1 477 000
Commissioning date II qtr. 2025
Area 34.39 m2
Price 36 477$ ₴1 539 330
Commissioning date II qtr. 2025
Area 31.77 m2