logo
square E-STORE
$ USD down
3D
  • Planning 1-rm flats area 29.83m2, KS-01B-01/0004.
  • Planning 1-rm flats area 29.83m2, KS-01B-01/0004.

1-комнатная квартира с европланировкой, 29.83м2

Keks, building 2, floor 1 ID: KS-01B-01/0004
one-room european layout (bedroom + kitchen-living room) Ванная
Flat ID
KS-01B-01/0004
Building
2
Floor
1
Number of rooms
1
Area
29.83 m2

About the flat

Хотите жить в уютном городке со всей необходимой инфраструктурой? Тогда переезжайте в квартиру KS-01B-01/0004 в жилом городке Keks. Она расположена на этаже этаже в доме №2.

При покупке квартиры в комплектации full, в вашей кухне-студии, площадью 17.62 м2, будет сразу установлена кухонная мебель, вытяжка, духовка, варочная поверхность и вся сантехника.

В санузле, площадью 3.23 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Specification

Flat ID
KS-01B-01/0004
Building
2
Floor
1
Area
29.83 m2
Number of rooms
1
Bathroom area
3.23 m2
Kitchen area
17.62 m2
Room area
8.98 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Keks/ Building 2/ 1 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
KS-01B-01/0004
Building
2
Floor
1
Area
29.83 m2
Number of rooms
1

Construction progress

How we build KEKS: early September
How we build KEKS: early September
20.09.2024
We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the...

We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the construction site into a real town of the future.

Every brick, every floor slab, every meter of laid communications is the result of the painstaking work of our builders, who put their soul and professionalism into their work. We use only the highest quality materials from proven suppliers to ensure the reliability and durability of each house.

We recently received a large batch of bricks, which allowed us to accelerate the pace of construction of load-bearing walls. In parallel, the construction of external walls has already been completed, which gives the complexes a finished look. The installation of floor slabs is in full swing, creating a solid frame for future apartments.

We pay special attention to engineering systems. The delivery of plumbing has already been completed, and we are preparing for its installation. This ensures that each apartment will be equipped with modern communications that provide comfort and convenience of living. We understand how important comfort and safety are for each client. Therefore, in addition to high quality construction, we also take care of creating a pleasant microclimate in each apartment. The modern energy-saving technologies that we use will reduce heating and air conditioning costs, as well as preserve the environment. We are confident that the KEKS residential complex will become a real pearl and will give its residents coziness, comfort and joy of living in a modern and safe home. Follow our updates so as not to miss important events and become one of the first owners of an apartment in the KEKS residential complex.

Unbreakable delivery of house B
Unbreakable delivery of house B
24.02.2024
The KEKS town continues to fill with life and character! Now, building B!!! The first keys to the second house of the first stage have been received,...

The KEKS town continues to fill with life and character! Now, building B!!! The first keys to the second house of the first stage have been received, and we are happy to congratulate investors on a new stage in their lives! ;)

In addition to character, KEKS is also filled with its own zest! Therefore, now, in addition to a nice signboard, which is a light in its heart, it has a real proof of courage - a steel plate, which testifies to the strength of the town and its unbreakable surrender during a full-scale war!✊

This event was so important for all of us that the CEO and founder of the holding, Boris Goldenshtein, came to its official and delicious celebration, along with honored guests from the ranks of the Armed Forces of Ukraine and the head of the Avangardivka territorial community, Serhiy Khrustovsky.

We defeat evil, we gain victory and we build a real town with the character of each of us!

Keks construction progress. Quarterly report
Keks construction progress. Quarterly report
24.01.2024
Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings -...

Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings - the concrete has arrived, the grillwork has been poured, and the windows have already arrived, the windows have been accepted (and the quality must be checked!), and here is a new batch of bricks. And so almost every day. But we don't complain, on the contrary, we brag! Because KEKS is under construction. To the anger of the enemies and to the joy of my mother.

Watch the video report from the KEKS construction site: we show how many materials arrive, how we build and which apartments we rent to investors. Also, follow the news on the website and in social networks - we regularly publish reports on the progress of construction and the life of the town. A lot of interesting things await you this year.

Stages of construction

Commissioning date II qtr. 2023
Building 2
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Keks construction progress. Quarterly report

24.01.2024

Similar flats in Keks

Price 27 000$ ₴1 138 050
Commissioning date II qtr. 2025
Area 29.2 m2
Price 28 000$ ₴1 180 200
Commissioning date II qtr. 2023
Area 36.36 m2
Price 29 900$ ₴1 260 290
Commissioning date II qtr. 2025
Area 36.45 m2
Price 31 000$ ₴1 306 650
Commissioning date II qtr. 2023
Area 34.2 m2

Similar flats in other projects

Price 26 803$ ₴1 129 750
Commissioning date II qtr. 2025
Area 25.22 m2
Price 28 281$ ₴1 192 050
Commissioning date II qtr. 2025
Area 32.19 m2
Price 29 000$ ₴1 222 350
Commissioning date II qtr. 2025
Area 32.3 m2
Price 31 105$ ₴1 311 080
Commissioning date II qtr. 2025
Area 29.18 m2