logo
square E-STORE
$ USD down
3D
  • Planning Storeroom area 7.91m2, KS-018-м1/К022.
  • Planning Storeroom area 7.91m2, KS-018-м1/К022.

Storeroom, 7.91m2

Keks, building 18, floor -1 ID: KS-018-м1/К022
3 955$ ₴164 730

Without decoration

Storeroom ID
KS-018-м1/К022
Building
18
Floor
-1
Area
7.91 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Basic-full to 48 mos. from 1 598$₴66 560 from 0$₴0/mos.
Super light with decoration Basic-full to 60 mos. from 411$₴17 120 from 74$₴3 090/mos.
Super light without decoration to 60 mos. from 411$₴17 120 from 0$₴0/mos.
Interest-free without decoration to 48 mos. from 1 598$₴66 560 from 0$₴0/mos.

About the storeroom

Кладовка KS-018-м1/К022, площадью 7.91 м2 расположена в доме №18 жилого городка Keks. Помещение удобно расположено — на -1 этаже.

Используйте эту кладовку для хранения сезонных вещей, закруток, зимней или летней резины. Для удобства использования, сюда проведено освещение.

Specification

Storeroom ID
KS-018-м1/К022
Building
18
Floor
-1
Area
7.91 m2

Floor location

Keks/ Building 18/ -1 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
KS-018-м1/К022
Building
18
Floor
-1
Area
7.91 m2

Calculator

Minimum payment $

Construction progress

Keks construction progress. Quarterly report
Keks construction progress. Quarterly report
24.01.2024
Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings -...

Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings - the concrete has arrived, the grillwork has been poured, and the windows have already arrived, the windows have been accepted (and the quality must be checked!), and here is a new batch of bricks. And so almost every day. But we don't complain, on the contrary, we brag! Because KEKS is under construction. To the anger of the enemies and to the joy of my mother.

Watch the video report from the KEKS construction site: we show how many materials arrive, how we build and which apartments we rent to investors. Also, follow the news on the website and in social networks - we regularly publish reports on the progress of construction and the life of the town. A lot of interesting things await you this year.

Stages of construction

Commissioning date III qtr. 2026
Building 18
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Supply of building materials

10.01.2024