logo
square E-STORE
$ USD down
3D
  • Planning Parking places area 1m2, KS-017-00/П004.
  • Planning Parking places area 1m2, KS-017-00/П004.

Parking places, 1m2

Keks, building 17, parking ID: KS-017-00/П004
Parking ID
KS-017-00/П004
Building
17
Floor
-2
Area
1.00 m2

About the parking place

Парковочное место KS-017-00/П004 находится на территории ЖК Keks.

Приобретая парковочное место, вы обеспечиваете безопасность для своей машины. Место закреплено за вами юридически, поэтому никто не имеет права припарковаться на нем.

Specification

Parking ID
KS-017-00/П004
Building
17
Floor
-2
Area
1.00 m2

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
KS-017-00/П004
Building
17
Floor
-2
Area
1.00 m2

Construction progress

How we build KEKS: early September
How we build KEKS: early September
20.09.2024
We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the...

We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the construction site into a real town of the future.

Every brick, every floor slab, every meter of laid communications is the result of the painstaking work of our builders, who put their soul and professionalism into their work. We use only the highest quality materials from proven suppliers to ensure the reliability and durability of each house.

We recently received a large batch of bricks, which allowed us to accelerate the pace of construction of load-bearing walls. In parallel, the construction of external walls has already been completed, which gives the complexes a finished look. The installation of floor slabs is in full swing, creating a solid frame for future apartments.

We pay special attention to engineering systems. The delivery of plumbing has already been completed, and we are preparing for its installation. This ensures that each apartment will be equipped with modern communications that provide comfort and convenience of living. We understand how important comfort and safety are for each client. Therefore, in addition to high quality construction, we also take care of creating a pleasant microclimate in each apartment. The modern energy-saving technologies that we use will reduce heating and air conditioning costs, as well as preserve the environment. We are confident that the KEKS residential complex will become a real pearl and will give its residents coziness, comfort and joy of living in a modern and safe home. Follow our updates so as not to miss important events and become one of the first owners of an apartment in the KEKS residential complex.

Keks construction progress. Quarterly report
Keks construction progress. Quarterly report
24.01.2024
Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings -...

Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings - the concrete has arrived, the grillwork has been poured, and the windows have already arrived, the windows have been accepted (and the quality must be checked!), and here is a new batch of bricks. And so almost every day. But we don't complain, on the contrary, we brag! Because KEKS is under construction. To the anger of the enemies and to the joy of my mother.

Watch the video report from the KEKS construction site: we show how many materials arrive, how we build and which apartments we rent to investors. Also, follow the news on the website and in social networks - we regularly publish reports on the progress of construction and the life of the town. A lot of interesting things await you this year.

Stages of construction

Commissioning date III qtr. 2026
Building 17
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Quality control of repair work

15.01.2024