logo
square E-STORE
$ USD down
3D
  • Planning 3-rm flats area 57m2, KS-013-02/0006.
  • Planning 3-rm flats area 57m2, KS-013-02/0006.

Трех комнатная квартира, 57м2

Keks, building 13, floor 2 ID: KS-013-02/0006
50 217$ ₴2 119 160

Without decoration

three-room european layout (3 bedrooms + kitchen-living room) Ванная Балкон
50 217$
₴2 119 160
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
KS-013-02/0006
Building
13
Floor
2
Number of rooms
3
Area
58.08 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Basic-full to 48 mos. from 20 288$₴856 160 from 327$₴13 800/mos.
Super light with decoration Basic-full to 60 mos. from 5 223$₴220 420 from 938$₴39 590/mos.
Super light without decoration to 60 mos. from 5 223$₴220 420 from 374$₴15 790/mos.
Interest-free without decoration to 48 mos. from 20 288$₴856 160 from 345$₴14 560/mos.

About the flat

Квартира KS-013-02/0006 находится на 2 этаже в доме №13 жилого городка Keks.

Из 3-комнатной квартиры открывается вид на [вид из окна]. Расположение комнат на северной стороне позволяет каждый день наслаждаться легкой прохладой даже в жаркий день.

У вас будет кухня-студия, площадью 15.53 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

В санузле, площадью 3.65 м2, есть ванна. При покупке квартиры в комплектации light или выше мы устанавливаем ее сразу.

Комнаты объединяет коридор, площадью 6.97 м2.

Выделенную лоджию, площадью 2.93 м2, можно обустроить под лаунж-зону, личный кабинет или рабочее место школьника. Надежные стеклопакеты и наличие отопления позволяют создать комфортный микроклимат. Лоджия выходит на север сторону. Поэтому отсюда вы можете каждый день наслаждаться легкой прохладой даже в жаркий день.

Балкон, площадью 1.53 м2 — это ваше пространство под открытым небом. Устройте себе зону для отдыха, чтобы каждый день наслаждаться легкой прохладой даже в жаркий день.

Specification

Flat ID
KS-013-02/0006
Building
13
Floor
2
Area
58.08 m2
Number of rooms
3
Balcony area
1.53 m2
Bathroom area
3.65 m2
Corridor area
6.97 m2
Kitchen area
15.53 m2
Loggia area
2.93 m2
Room area
12.69 m2
Room 2 area
7.63 m2
Room 3 area
7.15 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Keks/ Building 13/ 2 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
KS-013-02/0006
Building
13
Floor
2
Area
58.08 m2
Number of rooms
3

Calculator

Minimum payment $

Construction progress

How we build KEKS: early September
How we build KEKS: early September
20.09.2024
We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the...

We are proud to see our project gaining momentum every day. The active phase of construction of the first and second stages is turning the construction site into a real town of the future.

Every brick, every floor slab, every meter of laid communications is the result of the painstaking work of our builders, who put their soul and professionalism into their work. We use only the highest quality materials from proven suppliers to ensure the reliability and durability of each house.

We recently received a large batch of bricks, which allowed us to accelerate the pace of construction of load-bearing walls. In parallel, the construction of external walls has already been completed, which gives the complexes a finished look. The installation of floor slabs is in full swing, creating a solid frame for future apartments.

We pay special attention to engineering systems. The delivery of plumbing has already been completed, and we are preparing for its installation. This ensures that each apartment will be equipped with modern communications that provide comfort and convenience of living. We understand how important comfort and safety are for each client. Therefore, in addition to high quality construction, we also take care of creating a pleasant microclimate in each apartment. The modern energy-saving technologies that we use will reduce heating and air conditioning costs, as well as preserve the environment. We are confident that the KEKS residential complex will become a real pearl and will give its residents coziness, comfort and joy of living in a modern and safe home. Follow our updates so as not to miss important events and become one of the first owners of an apartment in the KEKS residential complex.

Keks construction progress. Quarterly report
Keks construction progress. Quarterly report
24.01.2024
Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings -...

Do you know what keeps us warm this cold winter? Movement. Because he is very active on the KEKS construction site. Let's just unload the fittings - the concrete has arrived, the grillwork has been poured, and the windows have already arrived, the windows have been accepted (and the quality must be checked!), and here is a new batch of bricks. And so almost every day. But we don't complain, on the contrary, we brag! Because KEKS is under construction. To the anger of the enemies and to the joy of my mother.

Watch the video report from the KEKS construction site: we show how many materials arrive, how we build and which apartments we rent to investors. Also, follow the news on the website and in social networks - we regularly publish reports on the progress of construction and the life of the town. A lot of interesting things await you this year.

Stages of construction

Commissioning date II qtr. 2026
Building 13
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Quality control of repair work

15.01.2024

Similar flats in Keks

Price 46 992$ ₴1 983 070
Commissioning date II qtr. 2026
Area 58.11 m2
Price 51 873$ ₴2 189 050
Commissioning date II qtr. 2026
Area 58.11 m2
Price 52 000$ ₴2 194 400
Commissioning date III qtr. 2025
Area 55.33 m2
Price 55 000$ ₴2 321 000
Commissioning date I qtr. 2026
Area 58.11 m2

Similar flats in other projects

Price 49 712$ ₴2 097 850
Commissioning date II qtr. 2025
Area 61.06 m2
Price 53 714$ ₴2 266 740
Commissioning date I qtr. 2026
Area 61.8 m2
Price 53 714$ ₴2 266 740
Commissioning date I qtr. 2026
Area 62.67 m2