logo
$ USD down

2 bedroom apartment, 63.4m2

Artville, building 5, floor 7 ID: AB-05-07/00003
48 184$ ₴2 004 460

Without decoration

three-room european layout (3 bedrooms + kitchen-living room) Ванная
67 204$
₴2 795 690
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
AB-05-07/00003
Building
5
Floor
7
Number of rooms
3
Area
63.40 m2
Area (paid)
63.40 m2
Period First installment, $ Monthly payment, $/m
Interest-free with decoration Basic-full to 36 mos. from 27 150$₴1 129 440 from 109$₴4 540/mos.
Interest-free with decoration Basic-light to 36 mos. from 27 150$₴1 129 440 from 39$₴1 630/mos.
Interest-free without decoration to 36 mos. from 27 150$₴1 129 440 from 136$₴5 660/mos.

About the flat

Do you want to live in a cozy town with all the necessary infrastructure? Then move to apartment AB-05-07/00003 in the residential town of Artville. It is located on the first floor of building No. 5.

The apartment has a kitchen with an area of ​​12.15 m2

There are 2 separate bathrooms. The area of ​​the first is 3.76 m2. It is designed for installing a bathtub. The second bathroom is smaller, it has an area of ​​2.05 m2.

The room sizes are 19.16 and 12.29 m2.

Specification

Flat ID
AB-05-07/00003
Building
5
Floor
7
Area
63.40 m2
Area (paid)
63.40 m2
Number of rooms
3
Bathroom area
2.23 m2
Kitchen area
26.74 m2
Room area
11.15 m2
Room 2 area
7.78 m2
Room 3 area
11.72 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 5/ 7 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-05-07/00003
Building
5
Floor
7
Area
63.40 m2
Number of rooms
3

Calculator

Minimum payment $

Construction progress

ARTVILLE - installation of window structures, building #5
ARTVILLE - installation of window structures, building #5
09.01.2025
We start the year with great news from building #5! We are installing window structures on the 7th floor. The work is carried out in stages and in...

We start the year with great news from building #5!

We are installing window structures on the 7th floor. The work is carried out in stages and in accordance with the technology.

Follow our news to stay up to date!

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

Stages of construction

Commissioning date III qtr. 2025
Building 5
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - preparation for handing over the keys, house #15

07.11.2024

Similar flats in Artville

Price 45 495$ ₴1 892 600
Commissioning date I qtr. 2026
Area 61.48 m2
Price 45 495$ ₴1 892 600
Commissioning date I qtr. 2026
Area 61.48 m2
Price 45 665$ ₴1 899 670
Commissioning date I qtr. 2026
Area 61.71 m2
Price 45 688$ ₴1 900 630
Commissioning date I qtr. 2026
Area 61.74 m2

Similar flats in other projects

Price 46 697$ ₴1 942 600
Commissioning date II qtr. 2026
Area 57.65 m2
Price 47 069$ ₴1 958 080
Commissioning date IV qtr. 2025
Area 58.11 m2
Price 49 712$ ₴2 068 020
Commissioning date IV qtr. 2025
Area 58.11 m2
Price 51 613$ ₴2 147 110
Commissioning date IV qtr. 2026
Area 63.72 m2