Construction progress

ARTVILLE - facade work, house #4
ARTVILLE - facade work, house #4
29.10.2024
Work has begun on insulating the facade with mineral wool on house #4, from the courtyard side. This will not only reduce heat consumption, but also...

Work has begun on insulating the facade with mineral wool on house #4, from the courtyard side. This will not only reduce heat consumption, but also provide protection from noise from outside.

Our team of craftsmen is working hard so that you can enjoy warmth, comfort and silence in your future home

ARTVILLE - facade works, building #4
ARTVILLE - facade works, building #4
09.08.2024
Facade works are actively underway in building #4. To date, 95% of the decorative plaster has been completed, which significantly changes the...

Facade works are actively underway in building #4. To date, 95% of the decorative plaster has been completed, which significantly changes the appearance of the building

The next important stage is ahead: painting the facade. This will be the decisive touch in creating the exterior of the house

ARTVILLE - masonry work, building #4
ARTVILLE - masonry work, building #4
26.06.2024
Recently, another stage of construction has begun in No. 4 - the construction of interior partitions (loggia walls). P.S. The house is also...

Recently, another stage of construction has begun in No. 4 - the construction of interior partitions (loggia walls).

P.S. The house is also undergoing work on installing ventilation systems and decorating the facade

Stages of construction

Commissioning date III qtr. 2025
Building 4
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Ventilation installation

16.11.2023

House No. 4 of the new ARTVILLE building is located in Odesa, opposite 7 km. It is a 12-story building with 174 apartments. It is made in a modern architectural style using bright colors. The facade is lined with high-quality durable plaster.

The apartments are rented with modern renovations using quality materials. Commercial premises are located on the first floor of the building. They face Spreys Street, which provides a large flow of potential customers. These are some of the best commercial premises in new buildings in Odessa, because their location ensures high demand and low competition.

The infrastructure and amenities of the ARTVILLE residential town include:

  • Security 24/7
  • Beauty salon
  • Gym
  • Cafe
  • Shops
  • Kindergarten and school
  • Recreation areas
  • Big park

Apartments in building No. 4 of the new ARTVILLE building in Odesa are distinguished by their spaciousness, comfort and modern design. The house has an individual heating system. The repair includes the installation of air conditioners, some furniture and appliances.

ARTVILLE residential town is an ideal place for those who want to live in a modern, comfortable new building in Odessa. Here you will find everything you need for a happy life: cozy apartments, developed infrastructure, security and a comfortable living environment.