logo
square E-STORE
$ USD down

1 комнатная квартира с европланировкой, 24.41м2

Artville, building 20, floor 7 ID: AB-20-07/0005а
one-room european layout (bedroom + kitchen-living room) Ванная
Flat ID
AB-20-07/0005а
Building
20
Floor
7
Number of rooms
1
Area
24.41 m2

About the flat

Квартира AB-20-07/0005а находится на 7 этаже в доме №20 жилого городка Artville.

У вас будет кухня-студия, площадью 11.56 м2. Это как дополнительная комната для семейного досуга, детских игр и приема гостей.

Площадь санузла — 3.13 м2. Здесь помещается ванна, вся необходимая сантехника и стиральная машина.

Комнаты объединяет коридор, площадью 2.80 м2.

Specification

Flat ID
AB-20-07/0005а
Building
20
Floor
7
Area
24.41 m2
Number of rooms
1
Bathroom area
3.13 m2
Corridor area
2.80 m2
Kitchen area
11.56 m2
Room area
6.92 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 20/ 7 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-20-07/0005а
Building
20
Floor
7
Area
24.41 m2
Number of rooms
1

Construction progress

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

ARTVILLE - interior work, building #15
ARTVILLE - interior work, building #15
19.09.2024
We are actively continuing interior work in building #15 We have completed the installation of stretch ceilings and wallpapering in the apartments...

We are actively continuing interior work in building #15

We have completed the installation of stretch ceilings and wallpapering in the apartments on the 1st and 2nd floors. We are also equipping the apartments on the 4th floor with kitchen furniture and plumbing.

By the way, a mailbox and bulletin boards have already been installed in the entrance area

Stages of construction

Commissioning date I qtr. 2026
Building 20
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - interior work, building #15

19.09.2024

Similar flats in Artville

Price 21 000$ ₴886 210
Commissioning date II qtr. 2026
Area 25.72 m2
Price 22 000$ ₴928 410
Commissioning date I qtr. 2026
Area 24.41 m2
Price 23 419$ ₴988 290
Commissioning date I qtr. 2026
Area 26.98 m2
Price 24 000$ ₴1 012 810
Commissioning date II qtr. 2026
Area 30.74 m2

Similar flats in other projects

Price 22 000$ ₴928 410
Commissioning date III qtr. 2026
Area 31 m2
Price 23 500$ ₴991 710
Commissioning date I qtr. 2026
Area 32.4 m2
Price 23 500$ ₴991 710
Commissioning date I qtr. 2026
Area 32.4 m2
Price 24 600$ ₴1 038 130
Commissioning date I qtr. 2026
Area 30.73 m2