logo
square E-STORE
$ USD down

Однокомнатная квартира, 32.27м2

Artville, building 16, floor 5 ID: AB-16-05/00013
24 081$ ₴1 035 010

Without decoration

one-room apartment Ванная
33 642$
₴1 445 940
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
AB-16-05/00013
Building
16
Floor
5
Number of rooms
1
Area
32.27 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 60 mos. from 3 499$₴150 390 from 628$₴27 000/mos.
Interest-free with decoration Basic-full to 48 mos. from 13 591$₴584 150 from 418$₴17 970/mos.
Super light with decoration Basic-light to 60 mos. from 3 499$₴150 390 from 606$₴26 050/mos.
Interest-free with decoration Basic-light to 48 mos. from 13 591$₴584 150 from 182$₴7 830/mos.
Super light without decoration to 60 mos. from 3 499$₴150 390 from 433$₴18 620/mos.
Interest-free without decoration to 48 mos. from 13 591$₴584 150 from 219$₴9 420/mos.

About the flat

AB-16-05/00013 — это квартира в жилом городке Artville, расположенная на 5 этаже в доме №16.

В квартире достаточно просторная кухня — ее площадь составляет 15.92 м2.Если покупаете квартиру в комплектации full, почти всю мебель и технику мы установим сразу.

Площадь санузла — 3.50 м2. Благодаря правильному расположению точек подключения, здесь помещается душевая кабина, стиральная машина и вся другая необходимая сантехника.

Квартира имеет классическую планировку, поэтому в ней есть прихожая и коридор, площадью 3.90 м2.

Specification

Flat ID
AB-16-05/00013
Building
16
Floor
5
Area
32.27 m2
Number of rooms
1
Bathroom area
3.50 m2
Corridor area
3.90 m2
Kitchen area
15.92 m2
Room area
8.95 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

Floor location

Artville/ Building 16/ 5 floor
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-16-05/00013
Building
16
Floor
5
Area
32.27 m2
Number of rooms
1

Calculator

Minimum payment $

Construction progress

ARTVILLE - plumbing installation, building #15
ARTVILLE - plumbing installation, building #15
05.12.2024
Work continues in building #15! We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check...

Work continues in building #15!

We are currently installing plumbing in the apartments on the lower floors. We carefully fasten everything and check it during work to make sure there are no leaks. After all, your further comfortable stay depends on it.

Stay with us to always be up to date with the construction processes!

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

ARTVILLE - window installation, building #5
ARTVILLE - window installation, building #5
10.10.2024
There is progress in building #5! We are completing the installation of windows on the 8th floor. So now we are looking forward to a new batch of...

There is progress in building #5!

We are completing the installation of windows on the 8th floor.

So now we are looking forward to a new batch of windows for the 7th floor, to continue the work, bringing the project closer to a new stage!

Permits

Лицензия на создание объектов архитектуры
Permission to perform construction works dated 11/14/2017
Permission to perform construction works dated 25.01.2019
Разрешение на выполнение строительных работ от 12.08.2021

Stages of construction

Commissioning date IV qtr. 2026
Building 16
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

ARTVILLE - window installation, building #5

10.10.2024

Similar flats in Artville

Price 24 000$ ₴1 031 520
Commissioning date II qtr. 2026
Area 30.74 m2
Price 25 000$ ₴1 074 500
Commissioning date II qtr. 2026
Area 30.48 m2
Price 25 500$ ₴1 095 990
Commissioning date II qtr. 2026
Area 26.27 m2
Price 25 500$ ₴1 095 990
Commissioning date II qtr. 2026
Area 30.24 m2

Similar flats in other projects

Price 23 500$ ₴1 010 030
Commissioning date I qtr. 2026
Area 32.4 m2
Price 24 600$ ₴1 057 310
Commissioning date I qtr. 2026
Area 30.73 m2
Price 25 399$ ₴1 091 650
Commissioning date I qtr. 2026
Area 34.26 m2
Price 25 520$ ₴1 096 850
Commissioning date II qtr. 2025
Area 32.51 m2