News from the ARTVILLE construction site:
House 15: We continue the repair and facade work, as well as the arrangement of the territory.
House 4: We received the materials and continue the glazing.
House 6: We continue to install interior partitions
Doma 21/22: Piling continues
UM-2: The 6th floor horizontal slab and the 7th floor vertical slab were poured with concrete.
UM-3: The interior walls and interior partitions of the 3rd floor were erected.
Just like a year ago, we are working to ensure that everyone who trusts us receives the keys to their own apartment and builds their life here with us. In the town of happy people.❤️
Permits
Stages of construction
Construction progress in February 2023
23.02.2023Interesting fact: building No. 15 is the first building of the ZEZMAN holding that was put into operation during a full-scale war. We completed the work in it and started handing over the keys to investors in March 2022. Almost all the apartments in the building were purchased at the excavation stage.
The building is located in a quiet courtyard, one minute's walk from the park. This is a comfortable house made in a modern architectural style. Inside, all conditions have been created for your comfort and safety. One of the features of the building is free wheelchairs on the first floor. Residents leave their bikes and strollers here.
Buying an apartment in a new ARTVILLE building means providing yourself with comfortable housing in Odessa, which will only become more expensive over time.