logo
square E-STORE
$ USD down

Storeroom, 2.85m2

Artville, building 15, floor -1 ID: AB-15-м1/К0010
2 100$ ₴88 520

Without decoration

Storeroom ID
AB-15-м1/К0010
Building
15
Floor
-1
Area
2.85 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 24 mos. from 218$₴9 190 from 0$₴0/mos.
Interest-free with decoration Basic-full to 48 mos. from 848$₴35 750 from 27$₴1 140/mos.
Interest-free with decoration Basic-light to 48 mos. from 848$₴35 750 from 0$₴0/mos.
Interest-free without decoration to 48 mos. from 848$₴35 750 from 0$₴0/mos.

About the storeroom

Кладовка AB-15-м1/К0010 расположена в жилом городке Artville на -1 этаже дома №15. Это помещение, площадью 2.85 м2.

Используйте эту кладовку для хранения сезонных вещей, закруток, зимней или летней резины. Для удобства использования, сюда проведено освещение.

Specification

Storeroom ID
AB-15-м1/К0010
Building
15
Floor
-1
Area
2.85 m2

Floor location

Artville/ Building 15/ -1 floor
img
Apartment on other floors:

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-15-м1/К0010
Building
15
Floor
-1
Area
2.85 m2

Calculator

Minimum payment $

Construction progress

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

ARTVILLE - interior work, building #15
ARTVILLE - interior work, building #15
19.09.2024
We are actively continuing interior work in building #15 We have completed the installation of stretch ceilings and wallpapering in the apartments...

We are actively continuing interior work in building #15

We have completed the installation of stretch ceilings and wallpapering in the apartments on the 1st and 2nd floors. We are also equipping the apartments on the 4th floor with kitchen furniture and plumbing.

By the way, a mailbox and bulletin boards have already been installed in the entrance area

Permits

Лицензия на создание объектов архитектуры
Permission to perform construction works dated 11/14/2017
Permission to perform construction works dated 25.01.2019
Разрешение на выполнение строительных работ от 12.08.2021

Stages of construction

Commissioning date III qtr. 2022
Building 15
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Monolithic works

31.01.2024