logo
square E-STORE
$ USD down

Smart-студия, 23.28м2

Artville, building 14, floor 1 ID: AB-14-01/00005
23 500$ ₴990 530

Assigment

smart apartment Ванная
23 500$
₴990 530
Decorated flat
Move in and live
  • ремонт
  • мебель
  • техника
  • сантехника
  • кондиционер
Flat ID
AB-14-01/00005
Building
14
Floor
1
Area
23.28 m2
Period First installment, $ Monthly payment, $/m
Super light with decoration Basic-full to 24 mos. from 2 444$₴103 020 from 910$₴38 360/mos.
Interest-free with decoration Basic-full to 48 mos. from 9 494$₴400 180 from 419$₴17 670/mos.
Interest-free with decoration Basic-light to 48 mos. from 9 494$₴400 180 from 247$₴10 420/mos.
Interest-free without decoration to 48 mos. from 9 494$₴400 180 from 274$₴11 550/mos.

About the flat

AB-14-01/00005 — это квартира в жилом городке Artville, расположенная на 1 этаже в доме №14.

Любуйтесь ежедневно на поле со своей SMART-студии. Расположение на восточной стороне дает ей дополнительное преимущество: вы можете каждый день наслаждаться тихими и живописными рассветами.

Начните самостоятельную жизнь в SMART-студии, площадью23.28 м2. Она максимально доступна по стоимости и требует минимум ухода и расходов на содержание.

В кухне-студии, площадью 15.37 м2, можно не только готовить, но и принимать гостей, устраивать семейные вечера или романтические тет-а-теты.

В санузле, площадью 3.06 м2, расположена удобная душевая кабина. Также мы позаботились о том, чтобы здесь поместилась стандартная стиральная машина.

Комнаты объединяет коридор, площадью 4.85 м2.

Specification

Flat ID
AB-14-01/00005
Building
14
Floor
1
Area
23.28 m2
Bathroom area
3.06 m2
Corridor area
4.85 m2
Kitchen area
15.37 m2

Analogues on other floors

  • Available

  • Booked

  • Not for sale

  • Sold

  • Chosen

What is included in the decoration

Покупая квартиру в жилом городке ARTVILLE, Вы вселяетесь сразу после сдачи дома, это возможно потому что застройщик осуществляет ремонт ещё на этапе строительства.

В ремонт квартиры от застройщика входит

decorated flats

Flat ID
AB-14-01/00005
Building
14
Floor
1
Area
23.28 m2

Calculator

Minimum payment $

Construction progress

ARTVILLE - installation of electrical fittings, building #15
ARTVILLE - installation of electrical fittings, building #15
28.11.2024
Work continues in building #15! Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step...

Work continues in building #15!

Our specialists are installing electrical fittings in the apartments on the lower floors! This is another step towards the comfort of future residents.

All sockets are conveniently located so that you can easily and effectively use them to connect electrical appliances

ARTVILLE - preparation for handing over the keys, house #15
ARTVILLE - preparation for handing over the keys, house #15
07.11.2024
Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors. We always care about your...

Our cleaning fairy is actively cleaning the apartments, which means that later there will be a transfer to investors.

We always care about your first impression of your new home, so we make it shine. All you have to do is furnish it to your taste.

So the next apartments on the 4th floor are already waiting for their owners, and as usual, we will film your emotions when handing over the keys

ARTVILLE - interior work, building #15
ARTVILLE - interior work, building #15
19.09.2024
We are actively continuing interior work in building #15 We have completed the installation of stretch ceilings and wallpapering in the apartments...

We are actively continuing interior work in building #15

We have completed the installation of stretch ceilings and wallpapering in the apartments on the 1st and 2nd floors. We are also equipping the apartments on the 4th floor with kitchen furniture and plumbing.

By the way, a mailbox and bulletin boards have already been installed in the entrance area

Permits

Лицензия на создание объектов архитектуры
Permission to perform construction works dated 11/14/2017
Permission to perform construction works dated 25.01.2019
Разрешение на выполнение строительных работ от 12.08.2021

Stages of construction

Commissioning date IV qtr. 2021
Building 14
Completed:
Commissioned
Inhabited
Pre-project work
Development of project documentation
Preparatory work
Basement construction
Construction of the building frame
Construction of external walls
Construction of internal walls
Windows installation
Roof construction
Facades construction
Black box decoration performing
Arrangement of internal engineering networks
Installation of elevator equipment
Publics fine finishing performing
Flats white box decoration performing
Landscaping
more about construction progress

Monolithic works

31.01.2024

Similar flats in Artville

Price 24 200$ ₴1 020 030
Commissioning date II qtr. 2026
Area 19.02 m2
Price 25 735$ ₴1 084 740
Commissioning date I qtr. 2026
Area 28.98 m2
Price 25 806$ ₴1 087 730
Commissioning date I qtr. 2026
Area 29.06 m2
Price 25 810$ ₴1 087 900
Commissioning date II qtr. 2026
Area 23.96 m2

Similar flats in other projects

Price 23 451$ ₴988 460
Commissioning date III qtr. 2026
Area 22.52 m2
Price 23 658$ ₴997 190
Commissioning date III qtr. 2026
Area 22.86 m2
Price 25 227$ ₴1 063 320
Commissioning date I qtr. 2026
Area 26.96 m2
Price 26 200$ ₴1 104 330
Commissioning date III qtr. 2026
Area 29.8 m2